Microsoft Fairwater Atlanta, announced against built

Microsoft Fairwater Atlanta is an SI compute project in Fayetteville, Georgia, by Microsoft. No source states a power figure for this project alone, so it is not in the Ledger's total. No power figure was announced. Epoch AI estimates 636 MW of IT power in operation (859 MW for the whole facility) as of June 14, 2026. Its state today: energized.

Announced
Not stated
Energized
636 MW ITJun 14, 2026
State
Energized
Source links
2

Announced

What was said, and when

Each row is one public announcement about Microsoft Fairwater Atlanta: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    Microsoft

    Infinite scale: The architecture behind the Azure AI superfactory

    Microsoft unveils its Fairwater site in Atlanta, Georgia. It states no power figure for the site.

    “Today, we are unveiling the next Fairwater site of Azure AI datacenters in Atlanta, Georgia.”
    Power or capacity stated
    None stated
    Promised
    None stated

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Energized

No power figure was announced. Epoch AI estimates 636 MW of IT power in operation (859 MW for the whole facility) as of June 14, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    Microsoft Fairwater Atlanta on the Power Map

    Epoch AI counts 4 buildings operating at Microsoft Fairwater Atlanta and estimates 636 MW of IT power (859 MW for the whole facility) as of June 14, 2026.

    Building 3 and 4 are operational.
    IT power running
    636 MW
    Whole facility
    859 MW

Heat Watch

Microsoft Fairwater Atlanta: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.2 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Microsoft Fairwater Atlanta: 2 buildings operating, 321 MW of IT power.Evidence · Epoch AI, on the Power Map

  2. Microsoft: no power figure stated.Announcement · The Official Microsoft Blog

  3. Microsoft Fairwater Atlanta: 2 buildings operating, 321 MW of IT power.Evidence · Epoch AI, on the Power Map

  4. Microsoft Fairwater Atlanta: 2 buildings operating, 321 MW of IT power.Evidence · Epoch AI, on the Power Map

  5. Microsoft Fairwater Atlanta: 4 buildings operating, 636 MW of IT power.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.