Gigawatt Ledger · Under construction

EcoDataCenter 2, Borlänge, announced against built

EcoDataCenter 2, Borlänge is an SI compute project in Borlänge, Dalarna County, Sweden, by Mistral AI and EcoDataCenter. No source states a power figure for this project alone, so it is not in the Ledger's total. Epoch AI tracks the site as under construction, with no building operating as of August 17, 2026. Its state today: under construction.

Announced
Not stated
Energized
NoneAug 17, 2026
State
Under construction
Source links
2

Announced

What was said, and when

Each row is one public announcement about EcoDataCenter 2, Borlänge: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    EcoDataCenter and Mistral AI

    Mistral AI and EcoDataCenter Partner to Build AI-focused Data Center in Sweden

    The two companies announce a data center at EcoDataCenter's Borlänge site. They state money and an opening year, and no power figure.

    “a strategic, long-term investment of €1.2 billion in Sweden’s digital infrastructure”
    “Scheduled to open in 2027”
    Power or capacity stated
    None stated
    Promised
    Opens in 2027

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Under construction

Epoch AI tracks the site as under construction, with no building operating as of August 17, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    EcoDataCenter 2 on the Power Map

    Epoch AI tracks EcoDataCenter 2 as under construction: no building is operating as of August 17, 2026.

    Buildings 1 and 2 look fully roofed, with active construction showing cooling and power equipment still being installed. Buildings 3-4 look like their foundations have been laid out and are early in construction.
    IT power running
    None
    Whole facility
    None

    Epoch AI projects 48 MW of IT power by June 30, 2028. A projection, not a fact yet.

Heat Watch

EcoDataCenter 2: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.1 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. EcoDataCenter 2: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  2. EcoDataCenter and Mistral AI: no power figure stated. Promised: opens in 2027.Announcement · EcoDataCenter

  3. EcoDataCenter 2: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  4. EcoDataCenter 2: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.