Gigawatt Ledger · Energized

Nebius Mäntsälä, announced against built

Nebius Mäntsälä is an SI compute project in Mäntsälä, Uusimaa, Finland, by Nebius. The announced figure is 75 MW, from Nebius (Oct 8, 2024). Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means. Its state today: energized.

Announced
75 MW
Energized
75 to 90 MWJun 29, 2026
State
Energized
Source links
2

Announced

What was said, and when

Each row is one public announcement about Nebius Mäntsälä: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    Nebius

    Nebius to triple capacity at Finland data center to 75 MW

    Nebius says it will triple its Mäntsälä data center.

    “Nebius to triple capacity at Finland data center to 75 MW”
    “place up to 60,000 GPUs at the Mäntsälä location alone”
    Power or capacity stated
    75 MW
    Promised
    None stated

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Energized

Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

  1. Epoch AI estimate

    Epoch AI · Power Map

    Nebius Mantsala on the Power Map

    Epoch AI counts 3 buildings operating at Nebius Mantsala and estimates 75 MW of IT power (90 MW for the whole facility) as of June 29, 2026.

    All three buildings in the first phase are operational.
    IT power running
    75 MW
    Whole facility
    90 MW

    Epoch AI projects 145 MW of IT power by December 31, 2027. A projection, not a fact yet.

Heat Watch

Nebius Mantsala: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day, a change of +0.1 °C since before work on this build began.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Nebius: 75 MW.Announcement · Nebius

  2. Nebius Mantsala: 2 buildings operating, 40 MW of IT power.Evidence · Epoch AI, on the Power Map

  3. Nebius Mantsala: 2 buildings operating, 40 MW of IT power.Evidence · Epoch AI, on the Power Map

  4. Nebius Mantsala: 3 buildings operating, 75 MW of IT power.Evidence · Epoch AI, on the Power Map

  5. Nebius Mantsala: 3 buildings operating, 75 MW of IT power.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.