Power Map · Operating, expanding
Nebius Mantsala, Mantsala
Nebius Mantsala is an SI data center in Mantsala, Uusimaa, Finland, owned by Nebius and used by Microsoft (Epoch AI rates this speculative). Epoch AI estimates its IT power at 75 MW as of June 29, 2026, with 3 buildings operating, and projects 145 MW by December 31, 2027. Its public timeline starts on October 8, 2024.
- IT power
- 75 MWJun 29, 2026
- Facility power
- 90 MW
- Status
- Operating, expanding
- Buildings operating
- 3
Where it is
The site and its facts
Nebius Mantsala on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Mantsala, Uusimaa, Finland
- Address
- Not public
- Coordinates
- 60.6294° N, 25.2605° E
- Owner
- Nebius
- Users
- Microsoft (Epoch AI rates this speculative)
- Chips
- H100, B300, H200
- Compute
- About 48,528 H100 equivalentsEpoch AI estimate, Jun 29, 2026
- Projected
- 145 MW IT power by December 31, 2027Epoch AI projection, not a fact yet
The Gigawatt Ledger · Energized
Nebius Mäntsälä: announced against built
75 MW was announced for this project. Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.
Heat Watch
Nebius Mantsala: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day, a change of +0.1 °C since before work on this build began.
Lights On
Nebius Mantsala: light at night
NASA's night imagery read 7.0 of 100 over this site in October 2026, against 10.0 in October 2018, the first month read. Against a year before: -4.8 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Nebius Mantsala, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Nebius announces expansion of Mantsala campus to 75MW.
40 MW2 operating
Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point.
40 MW2 operating
Nebius announces that the expansion to 75MW is operational at the beginning of 2026.
75 MW3 operating
All three buildings in the first phase are operational.
75 MW3 operating
According to company estimates, the second expansion of 70MW will be complete by the end of 2027.
145 MW4 operating
Adopt a site
Watch Nebius Mantsala
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Nebius to triple capacity of Mantsala campus to 75 MW
- Nebius announcing deployment of first GB300 NVL72 systems in Europe
- Epoch AI, "AI data centers", the record for Nebius Mantsala (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
537 km away
EcoDataCenter 2
Borlänge, Dalarna County, Sweden
IT power not stated
955 km away
Microsoft Narvik Norway
Bjerkvik, Narvik, Norway
IT power not stated
1,013 km away
CoreWeave Norway
Øvrebø, Agder, Norway
42 MW IT power
1,838 km away
Google Waltham Cross
Cheshunt, Hertfordshire, United Kingdom
88 MW IT power
Questions
Nebius Mantsala, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Nebius Mantsala?
Nebius Mantsala is in Mantsala, Uusimaa, Finland. Epoch AI publishes its coordinates as 60.6294, 25.2605.
Who owns Nebius Mantsala?
Epoch AI lists Nebius as its owner and Microsoft (Epoch AI rates this speculative) as its user.
How much power does Nebius Mantsala use?
Epoch AI estimates its IT power at 75 MW as of June 29, 2026, and its total facility power at 90 MW. It projects 145 MW of IT power by December 31, 2027.
Is Nebius Mantsala operating?
Yes, and it is growing. Epoch AI counts 3 buildings operating as of June 29, 2026, with more capacity on its timeline.