Nebius Mantsala is an SI data center in Mantsala, Uusimaa, Finland, owned by Nebius and used by Microsoft (Epoch AI rates this speculative). Epoch AI estimates its IT power at 75 MW as of June 29, 2026, with 3 buildings operating, and projects 145 MW by December 31, 2027. Its public timeline starts on October 8, 2024.

IT power
75 MWJun 29, 2026
Facility power
90 MW
Status
Operating, expanding
Buildings operating
3

Where it is

The site and its facts

Nebius Mantsala on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Mantsala, Uusimaa, FinlandOpen in OpenStreetMap
Place
Mantsala, Uusimaa, Finland
Address
Not public
Coordinates
60.6294° N, 25.2605° E
Owner
Nebius
Users
Microsoft (Epoch AI rates this speculative)
Chips
H100, B300, H200
Compute
About 48,528 H100 equivalentsEpoch AI estimate, Jun 29, 2026
Projected
145 MW IT power by December 31, 2027Epoch AI projection, not a fact yet

The Gigawatt Ledger · Energized

Nebius Mäntsälä: announced against built

75 MW was announced for this project. Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

Heat Watch

Nebius Mantsala: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day, a change of +0.1 °C since before work on this build began.

Lights On

Nebius Mantsala: light at night

NASA's night imagery read 7.0 of 100 over this site in October 2026, against 10.0 in October 2018, the first month read. Against a year before: -4.8 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Nebius Mantsala, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Nebius announces expansion of Mantsala campus to 75MW.

    40 MW2 operating

  2. Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point.

    40 MW2 operating

  3. Nebius announces that the expansion to 75MW is operational at the beginning of 2026.

    75 MW3 operating

  4. All three buildings in the first phase are operational.

    75 MW3 operating

  5. According to company estimates, the second expansion of 70MW will be complete by the end of 2027.

    145 MW4 operating

Adopt a site

Watch Nebius Mantsala

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Nebius Mantsala, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Nebius Mantsala?

Nebius Mantsala is in Mantsala, Uusimaa, Finland. Epoch AI publishes its coordinates as 60.6294, 25.2605.

Who owns Nebius Mantsala?

Epoch AI lists Nebius as its owner and Microsoft (Epoch AI rates this speculative) as its user.

How much power does Nebius Mantsala use?

Epoch AI estimates its IT power at 75 MW as of June 29, 2026, and its total facility power at 90 MW. It projects 145 MW of IT power by December 31, 2027.

Is Nebius Mantsala operating?

Yes, and it is growing. Epoch AI counts 3 buildings operating as of June 29, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).