Stargate Norway, announced against built

Stargate Norway (Narvik) is an SI compute project in Narvik, Nordland, Norway, by Nscale, Aker, OpenAI and Microsoft. The announced figure is 230 MW campus, from Nscale (Apr 14, 2026). Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026. Its state today: under construction.

Announced
230 MW
Energized
NoneJul 5, 2026
State
Under construction
Source links
3

Announced

What was said, and when

Each row is one public announcement about Stargate Norway: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    Nscale

    Stargate Norway: Laying the foundation for the future of AI

    Nscale describes Stargate Norway, a joint venture with Aker, with OpenAI as a partner.

    “230MW of initial capacity powered by renewable hydropower”
    “ambitions to scale by an additional 290MW”
    “will target to deliver 100,000 NVIDIA GPUs”
    Power or capacity stated
    230 MW initial capacity; ambition for 290 MW more
    Promised
    None stated
  2. Company statement

    Nscale

    Nscale announces expanded deal with Microsoft in Norway

    Nscale expands its Microsoft deal at the Narvik campus and says it will manage the campus alone.

    “230 MW Nscale Narvik campus”
    “will add more than 30,000 NVIDIA Rubin GPUs in deployment”
    “deliver even more high-performance AI compute capacity in Norway in 2027”
    Power or capacity stated
    230 MW campus
    Promised
    More capacity in 2027
Not counted

The larger figure, 230 MW with ambitions for 290 MW more (Nscale, Aug 14, 2025), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Under construction

Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    Microsoft Narvik Norway on the Power Map

    Epoch AI tracks Microsoft Narvik Norway as under construction: no building is operating as of July 5, 2026.

    Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.
    IT power running
    None
    Whole facility
    None

    Epoch AI projects 92 MW of IT power by December 31, 2026. A projection, not a fact yet.

Heat Watch

Microsoft Narvik Norway: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Microsoft Narvik Norway: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  2. Microsoft Narvik Norway: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  3. Nscale: 230 MW initial capacity; ambition for 290 MW more.Announcement · Nscale

  4. Nscale: 230 MW campus. Promised: more capacity in 2027.Announcement · Nscale

  5. Microsoft Narvik Norway: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  6. Microsoft Narvik Norway: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.