Power Map · Under construction
Microsoft Narvik Norway, Bjerkvik
Microsoft Narvik Norway is an SI data center in Bjerkvik, Narvik, Norway, owned by Nscale (Epoch AI rates this likely) and used by Microsoft (Epoch AI rates this likely). Epoch AI tracks it as under construction: no building is operating yet as of July 5, 2026, and projects 92 MW by December 31, 2026. Its public timeline starts on July 1, 2023.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Microsoft Narvik Norway on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Bjerkvik, Narvik, Norway
- Address
- Not public
- Coordinates
- 68.5763° N, 17.5963° E
- Owner
- Nscale (Epoch AI rates this likely)
- Users
- Microsoft (Epoch AI rates this likely)
- Projected
- 92 MW IT power by December 31, 2026Epoch AI projection, not a fact yet
The Gigawatt Ledger · Under construction
Stargate Norway: announced against built
230 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026.
Heat Watch
Microsoft Narvik Norway: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.
Lights On
Microsoft Narvik Norway: light at night
NASA's night imagery read 9.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +8.2 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Microsoft Narvik Norway, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing and site prep begins at least as early as July 2023.
No IT power yet0 operating
Site prep continues for Buildings 1, 2, and 3.
No IT power yet0 operating
Building 1 starts to go up.
No IT power yet0 operating
Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.
No IT power yet0 operating
Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.
No IT power yet0 operating
We believe Buildings 1 and 2 will be fully operational by the end of H2 2026
92 MW2 operating
Adopt a site
Watch Microsoft Narvik Norway
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Nscale announcing more than 30.000 Rubin GPUs
- NScale announcing 230 initial MW and possibly an additional 290MW, mentioning 100.000 Nvidia GPUs
- Local hydropower facilities will fulfill new demand at 4 to 5 cents per unit for electricity
- Epoch AI, "AI data centers", the record for Microsoft Narvik Norway (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
Questions
Microsoft Narvik Norway, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Microsoft Narvik Norway?
Microsoft Narvik Norway is in Bjerkvik, Narvik, Norway. Epoch AI publishes its coordinates as 68.5763, 17.5963.
Who owns Microsoft Narvik Norway?
Epoch AI lists Nscale (Epoch AI rates this likely) as its owner and Microsoft (Epoch AI rates this likely) as its user.
How much power does Microsoft Narvik Norway use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 92 MW of IT power by December 31, 2026.
Is Microsoft Narvik Norway operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).