Power Map · Under construction

Microsoft Narvik Norway, Bjerkvik

Microsoft Narvik Norway is an SI data center in Bjerkvik, Narvik, Norway, owned by Nscale (Epoch AI rates this likely) and used by Microsoft (Epoch AI rates this likely). Epoch AI tracks it as under construction: no building is operating yet as of July 5, 2026, and projects 92 MW by December 31, 2026. Its public timeline starts on July 1, 2023.

IT power
Not statedEpoch AI
Facility power
Not stated
Status
Under construction
Buildings operating
0

Where it is

The site and its facts

Microsoft Narvik Norway on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Bjerkvik, Narvik, NorwayOpen in OpenStreetMap
Place
Bjerkvik, Narvik, Norway
Address
Not public
Coordinates
68.5763° N, 17.5963° E
Owner
Nscale (Epoch AI rates this likely)
Users
Microsoft (Epoch AI rates this likely)
Projected
92 MW IT power by December 31, 2026Epoch AI projection, not a fact yet

The Gigawatt Ledger · Under construction

Stargate Norway: announced against built

230 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026.

Heat Watch

Microsoft Narvik Norway: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

Lights On

Microsoft Narvik Norway: light at night

NASA's night imagery read 9.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +8.2 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Microsoft Narvik Norway, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing and site prep begins at least as early as July 2023.

    No IT power yet0 operating

  2. Site prep continues for Buildings 1, 2, and 3.

    No IT power yet0 operating

  3. Building 1 starts to go up.

    No IT power yet0 operating

  4. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

    No IT power yet0 operating

  5. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

    No IT power yet0 operating

  6. We believe Buildings 1 and 2 will be fully operational by the end of H2 2026

    92 MW2 operating

Adopt a site

Watch Microsoft Narvik Norway

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Microsoft Narvik Norway, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Microsoft Narvik Norway?

Microsoft Narvik Norway is in Bjerkvik, Narvik, Norway. Epoch AI publishes its coordinates as 68.5763, 17.5963.

Who owns Microsoft Narvik Norway?

Epoch AI lists Nscale (Epoch AI rates this likely) as its owner and Microsoft (Epoch AI rates this likely) as its user.

How much power does Microsoft Narvik Norway use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 92 MW of IT power by December 31, 2026.

Is Microsoft Narvik Norway operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.