Homer City Energy Campus: seven GE Vernova 7HA.02 gas turbines, up to 4,400 MW. It serves a planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. Status: permitted, as of November 18, 2025. Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.
- Size
- up to 4,400 MW
- Fuel
- Gas
- Status
- Permitted
- As of
- Nov 18, 2025
The facts
What the public record shows
On site, behind the meter or beside the campus. Each fact below names its source.
- The Pennsylvania DEP lists final Air Quality Plan Approval 32-00457A of November 18, 2025 for the redevelopment of the site into a gas powered data center campus (DEP page, updated November 12, 2026).
- The developer says the approval covers up to 4.4 GW from seven GE Vernova 7HA.02 turbines, with first power expected in 2027 (Homer City Generation, November 20, 2025).
The filing
The permit or filing behind it
The regulator's decision or the owner's filing that the status rests on.
Permitted · Nov 18, 2025
Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.
The site
The data center it serves
Linked to the Power Map only where a source ties the two.
Not on the Power Map
A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. No source read ties this plant to a site the Power Map lists, so no site is linked.
Sources
Where every fact comes from
Each source was opened and read on November 23, 2026.
Nov 12, 2026, read Nov 23, 2026
Pennsylvania DEP
Homer City Generation Site Redevelopment
Nov 20, 2025, read Nov 23, 2026
Homer City Generation
Homer City Generation Receives Air Quality Plan Approval from PA DEP
Keep going
The grid around it
The same place, other records.
The Queue: PJM
How much power data centers are asking PJM for.
See the queueOnsite Power Watch
Every plant built to run a data center directly.
Every plantGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerQuestions
Homer City Energy Campus, answered
The plant, its status and the sources.
What is Homer City Energy Campus?
Seven GE Vernova 7HA.02 gas turbines, up to 4,400 MW, built to serve A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. On site, behind the meter or beside the campus.
What is its status?
Permitted, as of November 18, 2025: Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.
Where do the facts come from?
From the sources listed on this page, each opened and read on November 23, 2026. The Pennsylvania DEP lists final Air Quality Plan Approval 32-00457A of November 18, 2025 for the redevelopment of the site into a gas powered data center campus (DEP page, updated November 12, 2026).
Join the takeover
Watch the plants with us
Found a newer permit or filing for this plant? Bring it to the $SIS Telegram with its link.