Onsite Power Watch · Gas

Homer City Energy Campus

Homer City Energy Campus: seven GE Vernova 7HA.02 gas turbines, up to 4,400 MW. It serves a planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. Status: permitted, as of November 18, 2025. Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.

Fuel
Gas
Status
Permitted

The facts

What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

  • The Pennsylvania DEP lists final Air Quality Plan Approval 32-00457A of November 18, 2025 for the redevelopment of the site into a gas powered data center campus (DEP page, updated November 12, 2026).
  • The developer says the approval covers up to 4.4 GW from seven GE Vernova 7HA.02 turbines, with first power expected in 2027 (Homer City Generation, November 20, 2025).

The filing

The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Permitted · Nov 18, 2025

Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.

Open the filing

The site

The data center it serves

Linked to the Power Map only where a source ties the two.

Not on the Power Map

A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. No source read ties this plant to a site the Power Map lists, so no site is linked.

The Power Map

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026.

  • Nov 12, 2026, read Nov 23, 2026

    Pennsylvania DEP

    Homer City Generation Site Redevelopment

    Open the source

  • Nov 20, 2025, read Nov 23, 2026

    Homer City Generation

    Homer City Generation Receives Air Quality Plan Approval from PA DEP

    Open the source

Questions

Homer City Energy Campus, answered

The plant, its status and the sources.

What is Homer City Energy Campus?

Seven GE Vernova 7HA.02 gas turbines, up to 4,400 MW, built to serve A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania. On site, behind the meter or beside the campus.

What is its status?

Permitted, as of November 18, 2025: Pennsylvania DEP final Air Quality Plan Approval 32-00457A, November 18, 2025.

Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The Pennsylvania DEP lists final Air Quality Plan Approval 32-00457A of November 18, 2025 for the redevelopment of the site into a gas powered data center campus (DEP page, updated November 12, 2026).