Onsite Power Watch · permits and filings

Power plants built for data centers

Onsite Power Watch lists the power plants built to run data centers directly, one by one from permits and filings: 12 so far, 9 gas plants and 3 nuclear agreements. The gas plants with a stated size add up to 13,663 MW (8 of 9 state one). 3 run today, 2 are being built, 5 are permitted and 2 are proposed.

Plants tracked
12
Running
3
Building
2
Permitted
5
Proposed
2
Gas capacity stated
13,663 MW

Plant by plant

12 plants, one page each

Running first, then building, permitted and proposed. Each card opens the plant: the site it serves, its permit or filing, its sources.

Totals

By fuel and by status

Counts are true by definition. Capacity is added only for the gas plants, and only where a source states it (8 of 9). Nuclear agreements are amounts under contract or a plant's size, two different things, so they are never added.

Plants by fuel and status (counts), with the gas capacity stated in the sources (MW)
FuelProposedPermittedBuildingRunningAll
Gas25119
Nuclear00123
Gas capacity stated, MW5,6447,25940036013,663

2 of the plants include batteries (Apollo Power Generation Facility, Richland Parish 1 to 4 and Pointe Coupee 1 to 3). Their battery size is on each plant's page where a source gives it.

Method

How a plant gets on the list

From the public record only, with the date of every fact.

The filing first

A plant is listed when a permit, a siting decision, a commission filing or the owner's own statement names it and the data center it serves. A report is used where it describes a public permit.

Every plant

The site

Where a plant serves a site on the Power Map, the page links it, and only where a source or the site's own Epoch AI record ties the two.

The Power Map

The status

Proposed, permitted, building or running, as the newest source read says, with that source's date. Nothing is guessed from photos or maps.

The totals

The recheck

Every month the list is read again: new permits, new filings, plants that change status. The list is below.

The recheck list

Every month

The monthly recheck list

What is read again each month, and what is still missing.

  • Texas

    State air permits for data center plants (the Texas Tribune counted at least 15 planned gas plants), the GW Ranch permit in Pecos County and Meta El Paso.

    Where to look

  • xAI

    The capacity of the 41 Southaven turbines and any new Memphis permits.

    Where to look

  • Ohio

    Ohio Power Siting Board cases for behind the meter plants serving data centers.

    Where to look

  • Louisiana

    The LPSC decision on the Evest units, expected in December 2026.

    Where to look

  • Nuclear

    The Crane restart schedule and new nuclear agreements with data center owners.

    Where to look

  • Global Energy Monitor

    Whether its tracker data may be reused here (its license was not confirmed from its pages on November 23, 2026, so none of its project data is used).

    Where to look

Public JSON, any origin, no key

Every plant
https://sicto.si/api/sis-onsite.php?a=listEach plant with its size, fuel, status, site and filing, and the counts.
One plant
https://sicto.si/api/sis-onsite.php?a=plant&p=socratesThe plant with its facts and sources.
The whole set
https://siscto.si/assets/data/onsite-power.jsonOne file with every plant and source, as built into this release.

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026. Global Energy Monitor's tracker data is not used: its license could not be confirmed from its pages.

  • Jun 3, 2025, read Nov 23, 2026

    Constellation

    Constellation, Meta Sign 20-Year Deal for Clean, Reliable Nuclear Energy in Illinois

    Open the source

  • page read Nov 23, 2026, read Nov 23, 2026

    Constellation

    Crane Clean Energy Center

    Open the source

  • Feb 19, 2026, read Nov 23, 2026

    Entergy

    Annual report for 2025 (SEC Form 10-K)

    Open the source

  • Nov 2, 2026, read Nov 23, 2026

    Entergy

    Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)

    Open the source

  • August 2026, read Nov 23, 2026

    Global Energy Monitor

    U.S. gas power proposals tied to data centers nearly double in six months

    Open the source

  • Nov 20, 2025, read Nov 23, 2026

    Homer City Generation

    Homer City Generation Receives Air Quality Plan Approval from PA DEP

    Open the source

  • Mar 10, 2026, read Nov 23, 2026

    Mississippi Free Press

    Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center

    Open the source

  • Jun 9, 2025, read Nov 23, 2026

    Ohio Power Siting Board

    OPSB approves construction of Licking County natural gas-fired power plant

    Open the source

  • Feb 3, 2026, read Nov 23, 2026

    Ohio Power Siting Board

    OPSB authorizes construction of Wood County power plant

    Open the source

  • Nov 12, 2026, read Nov 23, 2026

    Pennsylvania DEP

    Homer City Generation Site Redevelopment

    Open the source

  • Jun 11, 2025, read Nov 23, 2026

    Talen Energy

    Talen Energy Expands Nuclear Energy Relationship with Amazon

    Open the source

  • Jul 3, 2025, read Nov 23, 2026

    TechCrunch

    xAI gets permits for 15 natural gas generators at Memphis data center

    Open the source

  • Jul 9, 2026, read Nov 23, 2026

    The Texas Tribune and Floodlight

    Planned Texas data centers could emit more greenhouse gases than many countries

    Open the source

  • August 2025, read Nov 23, 2026

    Williams

    Socrates North and South fact sheet

    Open the source

  • May 5, 2026, read Nov 23, 2026

    Williams

    Q1 earnings recap: data centers accelerate new growth paths for Williams

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Onsite Power Watch, answered

The plants, the statuses and the limits.

What is Onsite Power Watch?

A free list of the power plants built to run data centers directly: gas turbines and engines on the campus, batteries, utility plants certified to serve one data center, and nuclear plants under agreements with data center owners. Each plant shows the site it serves, its size, its fuel, its status and the permit or filing behind it, with links and dates.

Why are data centers building their own power plants?

To get power sooner than the grid can deliver it. Global Energy Monitor reported in August 2026 that about 77 GW of the gas capacity in development in Texas is planned to power data centers directly. Onsite Power Watch lists the plants one by one, from permits and filings.

What do the statuses mean?

Proposed: a plan or an application, not yet approved. Permitted: a regulator approved it (an air permit, a siting certificate or a commission order). Building: the developer or a filing says construction is under way. Running: the plant runs. For a nuclear agreement, the status is the plant's own; the agreement's start date is on its page.

Why are some sizes missing?

A size appears only where a permit, a filing or a report read for the page states it. The 41 turbines permitted in Southaven, Mississippi have no capacity in the sources read, so the page says so instead of guessing.

Does it say these plants are good or bad?

No. It lists what the public record shows: the plant, the permit and the dates. It does not judge a plant, a company or a permit, and it makes no forecast.

Can I reuse the data?

Yes. Every plant is a set of facts from public documents, linked to them. The whole set is a free download at /assets/data/onsite-power.json, and a public JSON answers at https://sicto.si/api/sis-onsite.php?a=list for any origin, with no key.