The filing first
A plant is listed when a permit, a siting decision, a commission filing or the owner's own statement names it and the data center it serves. A report is used where it describes a public permit.
Onsite Power Watch · permits and filings
Onsite Power Watch lists the power plants built to run data centers directly, one by one from permits and filings: 12 so far, 9 gas plants and 3 nuclear agreements. The gas plants with a stated size add up to 13,663 MW (8 of 9 state one). 3 run today, 2 are being built, 5 are permitted and 2 are proposed.
Plant by plant
Running first, then building, permitted and proposed. Each card opens the plant: the site it serves, its permit or filing, its sources.
Running Nuclear
1,920 MW
Amazon's data center campus beside the Susquehanna plant, Pennsylvania
Salem Township, PA · as of Jun 11, 2025
Open the plantRunning Nuclear
1,121 MW
Meta, under a power purchase agreement (no single data center named)
Clinton, IL · as of Jun 3, 2025
Open the plantRunning Gas
360 MW
The OpenAI Stargate campus built by Crusoe in Abilene, Texas
Abilene, TX · as of Jul 9, 2026
Open the plantBuilding Nuclear
835 MW
Microsoft, under a power purchase agreement (no single data center named)
Middletown, PA · as of the plant page read Nov 23, 2026
Open the plantBuilding Gas
400 MW
A data center of Sidecat, LLC, an affiliate of Meta Platforms, in New Albany, Ohio
New Albany, OH · as of May 5, 2026
Open the plantPermitted Gas
up to 4,400 MW
A planned data center campus at the former Homer City coal plant, Indiana County, Pennsylvania
Homer City, PA · as of Nov 18, 2025
Open the plantPermitted Gas
2,262 MW
A Meta data center in north Louisiana (the Power Map's Meta Hyperion)
Richland Parish and Killona, LA · as of August 2025
Open the plantPermitted Gas
350 MW
The data center campus of Liames, LLC, beside the plant in Wood County, Ohio
Middleton Township, Wood County, OH · as of Feb 3, 2026
Open the plantPermitted Gas
up to 247 MW
xAI's Colossus 1 data center, Memphis, Tennessee
Memphis, TN · as of Jul 2, 2025
Open the plantPermitted Gas
Size not stated
xAI's Colossus 2 data center in Memphis, Tennessee, across the state line
Southaven, MS · as of Mar 10, 2026
Open the plantProposed Gas
5,278 MW
A second Meta data center in north Louisiana, to be developed by Evest LLC
Richland Parish and Pointe Coupee Parish, LA · as of Nov 2, 2026
Open the plantProposed Gas
366 MW
A Meta data center in El Paso, Texas
El Paso, TX · as of Jul 9, 2026
Open the plantTotals
Counts are true by definition. Capacity is added only for the gas plants, and only where a source states it (8 of 9). Nuclear agreements are amounts under contract or a plant's size, two different things, so they are never added.
| Fuel | Proposed | Permitted | Building | Running | All |
|---|---|---|---|---|---|
| Gas | 2 | 5 | 1 | 1 | 9 |
| Nuclear | 0 | 0 | 1 | 2 | 3 |
| Gas capacity stated, MW | 5,644 | 7,259 | 400 | 360 | 13,663 |
2 of the plants include batteries (Apollo Power Generation Facility, Richland Parish 1 to 4 and Pointe Coupee 1 to 3). Their battery size is on each plant's page where a source gives it.
Method
From the public record only, with the date of every fact.
A plant is listed when a permit, a siting decision, a commission filing or the owner's own statement names it and the data center it serves. A report is used where it describes a public permit.
Where a plant serves a site on the Power Map, the page links it, and only where a source or the site's own Epoch AI record ties the two.
Proposed, permitted, building or running, as the newest source read says, with that source's date. Nothing is guessed from photos or maps.
Every month the list is read again: new permits, new filings, plants that change status. The list is below.
Every month
What is read again each month, and what is still missing.
Texas
State air permits for data center plants (the Texas Tribune counted at least 15 planned gas plants), the GW Ranch permit in Pecos County and Meta El Paso.
xAI
The capacity of the 41 Southaven turbines and any new Memphis permits.
Ohio
Ohio Power Siting Board cases for behind the meter plants serving data centers.
Louisiana
The LPSC decision on the Evest units, expected in December 2026.
Nuclear
The Crane restart schedule and new nuclear agreements with data center owners.
Global Energy Monitor
Whether its tracker data may be reused here (its license was not confirmed from its pages on November 23, 2026, so none of its project data is used).
Public JSON, any origin, no key
Sources
Each source was opened and read on November 23, 2026. Global Energy Monitor's tracker data is not used: its license could not be confirmed from its pages.
Jun 3, 2025, read Nov 23, 2026
Constellation, Meta Sign 20-Year Deal for Clean, Reliable Nuclear Energy in Illinois
page read Nov 23, 2026, read Nov 23, 2026
Crane Clean Energy Center
Feb 19, 2026, read Nov 23, 2026
Annual report for 2025 (SEC Form 10-K)
Nov 2, 2026, read Nov 23, 2026
Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)
August 2026, read Nov 23, 2026
U.S. gas power proposals tied to data centers nearly double in six months
Nov 20, 2025, read Nov 23, 2026
Homer City Generation Receives Air Quality Plan Approval from PA DEP
Mar 10, 2026, read Nov 23, 2026
Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center
Jun 9, 2025, read Nov 23, 2026
OPSB approves construction of Licking County natural gas-fired power plant
Feb 3, 2026, read Nov 23, 2026
OPSB authorizes construction of Wood County power plant
Nov 12, 2026, read Nov 23, 2026
Homer City Generation Site Redevelopment
Jun 11, 2025, read Nov 23, 2026
Talen Energy Expands Nuclear Energy Relationship with Amazon
Jul 3, 2025, read Nov 23, 2026
xAI gets permits for 15 natural gas generators at Memphis data center
Jul 9, 2026, read Nov 23, 2026
Planned Texas data centers could emit more greenhouse gases than many countries
August 2025, read Nov 23, 2026
Socrates North and South fact sheet
May 5, 2026, read Nov 23, 2026
Q1 earnings recap: data centers accelerate new growth paths for Williams
retrieved Nov 10, 2026
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
The set
Each reads a different public record of the same sites and grids.
Every SI data center public data can confirm, with its power.
Open the mapWhat was announced against what is confirmed energized.
Read the LedgerHow much power data centers are asking each grid for.
See the queueLive demand on the grids that host the most sites.
Watch the gridsHome power prices in every state with a site.
Read the billQuestions
The plants, the statuses and the limits.
A free list of the power plants built to run data centers directly: gas turbines and engines on the campus, batteries, utility plants certified to serve one data center, and nuclear plants under agreements with data center owners. Each plant shows the site it serves, its size, its fuel, its status and the permit or filing behind it, with links and dates.
To get power sooner than the grid can deliver it. Global Energy Monitor reported in August 2026 that about 77 GW of the gas capacity in development in Texas is planned to power data centers directly. Onsite Power Watch lists the plants one by one, from permits and filings.
Proposed: a plan or an application, not yet approved. Permitted: a regulator approved it (an air permit, a siting certificate or a commission order). Building: the developer or a filing says construction is under way. Running: the plant runs. For a nuclear agreement, the status is the plant's own; the agreement's start date is on its page.
A size appears only where a permit, a filing or a report read for the page states it. The 41 turbines permitted in Southaven, Mississippi have no capacity in the sources read, so the page says so instead of guessing.
No. It lists what the public record shows: the plant, the permit and the dates. It does not judge a plant, a company or a permit, and it makes no forecast.
Yes. Every plant is a set of facts from public documents, linked to them. The whole set is a free download at /assets/data/onsite-power.json, and a public JSON answers at https://sicto.si/api/sis-onsite.php?a=list for any origin, with no key.
Join the takeover
Found a permit or a filing for a plant that runs a data center? Bring it to the $SIS Telegram with its link.