The Queue · PJM
The queue at PJM
PJM has no single queue of loads. Utilities send it large load adjustments for its load forecast, and PJM accepts or trims them. Its own read in November 2025 supported data center growth of up to about 30 GW from 2025 to 2030. Dominion Energy, the largest data center market in PJM, told PJM in September 2026 that about 54 GW of data center capacity is under contract with it.
- Figures on file
- 4
- Newest figure
- Sep 29, 2026
- Power Map sites inside
- 19
- Live on Grid Watch
- Yes
Over time
Where the source repeats
This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.
The figures below are each a single reading. A line appears here once the same source gives the same measure three times.
Every figure
PJM, figure by figure
Newest first. Each card opens its source document.
Under contract
about 54 GW
as of September 29, 2026
Dominion EnergyDominion Energy: data center capacity under contract
Capacity under contract at three stages (engineering letters of authorization, construction letters of authorization and electric service agreements), as Dominion told PJM. Dominion excludes 19 GW of the engineering stage from its own forecast.
Dominion Energy, to PJM: Dominion Energy LSE 20-Year Data Center Forecast, Load Analysis Subcommittee, Sep 29, 2026
Running
4.8 GW
as of August 2026
Dominion EnergyDominion Energy: data center billing peak load
The peak billing load of the data centers Dominion serves, as of August 2026, in the same presentation. Load that runs today, unlike the contracts above.
Dominion Energy, to PJM: Dominion Energy LSE 20-Year Data Center Forecast, Load Analysis Subcommittee, Sep 29, 2026
Forecast
222,106 MW
as of January 14, 2026
Forecast summer peak in 2036
PJM's 2026 load forecast for the whole system's summer peak in 2036, a ten year increase of 65,733 MW. It counts all load, not only data centers.
PJM: 2026 PJM Load Forecast Report, Jan 14, 2026
Forecast
about 30 GW
as of November 24, 2025
Data center growth PJM's review supports, 2025 to 2030
PJM's own reading of utility requests and national projections: "Supports PJM data center growth of up to ~30 GW between 2025 and 2030." A forecast, not requests.
PJM: Load Adjustment Requests Summary for the 2026 Load Forecast, Load Analysis Subcommittee, Nov 24, 2025
| Figure | Amount | Stage | As of | Source |
|---|---|---|---|---|
| Dominion Energy: data center capacity under contract | about 54 GW | Under contract | September 29, 2026 | Dominion Energy, to PJM |
| Dominion Energy: data center billing peak load | 4.8 GW | Running | August 2026 | Dominion Energy, to PJM |
| Forecast summer peak in 2036 | 222,106 MW | Forecast | January 14, 2026 | PJM |
| Data center growth PJM's review supports, 2025 to 2030 | about 30 GW | Forecast | November 24, 2025 | PJM |
Utilities
The utilities in this grid
A utility's own count of the load it has agreed to serve, from its own filings.
American Electric Power (AEP)
AEP reports, each quarter, the new load backed by signed customer agreements across its companies in PJM, SPP and ERCOT. The count went from 24 GW in July 2025 to 69 GW through 2030 in July 2026, and to 84 GW by 2031 in October 2026. AEP's figure covers all of its companies; it is not split by grid except where AEP says so.
- New load by 2030 under customer agreements, GW, each dot a date the source gave
Under contract
84 GW
as of October 28, 2026
Contracted load by 2031
After 15 GW of new load commitments in the third quarter of 2026. AEP moved the horizon to 2031, so this figure is kept off the 2030 line.
AEP: Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1), Oct 28, 2026
Under contract
69 GW
as of July 30, 2026
Contracted load growth through 2030
After 6 GW more of signed load agreements in the second quarter of 2026, mainly in Texas.
AEP: Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1), Jul 30, 2026
Under contract
63 GW
as of May 5, 2026
New load by 2030 under signed agreements
After 7 GW of new load agreements signed in the first quarter of 2026. AEP Texas accounts for 41 GW of the commitments.
AEP: First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1), May 5, 2026
Under contract
56 GW
as of February 12, 2026
New load by 2030 under signed agreements
Incremental load by 2030, all backed by signed agreements. AEP Texas alone rose from 13 GW to 36 GW, backed by signed letters of agreement.
AEP: Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1), Feb 12, 2026
Under contract
28 GW
as of October 29, 2025
New load by 2030 under customer agreements
Load additions by 2030 backed by electric service agreements or letters of agreement, supported by an additional 190 GW of load requests.
AEP: Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1), Oct 29, 2025
Under contract
24 GW
as of July 30, 2025
New load by 2030 under customer agreements
Incremental load by 2030 under customer agreements with firm financial commitments, mainly in Indiana, Ohio and Texas. AEP also cited more than 190 GW of load requests at various stages.
AEP: Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1), Jul 30, 2025
On the Power Map
SI data centers inside PJM
Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.
The Power MapOperating, expanding
Anthropic-Amazon New Carlisle
New Carlisle, Indiana
1,037 MW of IT power
As of Oct 19, 2026, Epoch AI
On the Power MapOperating, expanding
Meta Prometheus
New Albany, Ohio
471 MW of IT power
As of Aug 31, 2026, Epoch AI
On the Power MapOperating
Google New Albany
New Albany, Ohio
333 MW of IT power
As of May 18, 2026, Epoch AI
On the Power MapOperating, expanding
Google Columbus
Columbus, Ohio
303 MW of IT power
As of Aug 5, 2026, Epoch AI
On the Power MapOperating
Google Bristow
Bristow, Virginia
238 MW of IT power
As of May 20, 2026, Epoch AI
On the Power MapOperating
QTS Richmond 1
Sandston, Virginia
238 MW of IT power
As of Feb 13, 2026, Epoch AI
On the Power MapOperating, expanding
AWS New Albany
New Albany, Ohio
213 MW of IT power
As of May 18, 2026, Epoch AI
On the Power MapOperating
QTS Richmond 2
Sandston, Virginia
180 MW of IT power
As of May 14, 2026, Epoch AI
On the Power MapOperating, expanding
QTS Richmond 3
Sandston, Virginia
144 MW of IT power
As of May 14, 2026, Epoch AI
On the Power MapOperating
Google Lancaster
Lancaster, Ohio
137 MW of IT power
As of Mar 12, 2026, Epoch AI
On the Power MapOperating, expanding
AWS Berwick
Berwick, Pennsylvania
108 MW of IT power
As of Aug 1, 2026, Epoch AI
On the Power MapOperating, expanding
STACK Infrastructure NVA02
Manassas, Virginia
85 MW of IT power
As of Feb 14, 2026, Epoch AI
On the Power MapOperating, expanding
CoreWeave Chester VA
Chester, Virginia
82 MW of IT power
As of May 20, 2026, Epoch AI
On the Power MapOperating
Google Arcola
Arcola, Virginia
77 MW of IT power
As of Jun 16, 2026, Epoch AI
On the Power MapOperating
Microsoft-Nebius New Jersey
Vineland, New Jersey
50 MW of IT power
As of Jul 12, 2026, Epoch AI
On the Power MapUnder construction
CoreWeave Lancaster Greenfield site
Lancaster, Pennsylvania
No building running yet
As of Jul 13, 2026, Epoch AI
On the Power MapUnder construction
Google Fort Wayne
Fort Wayne, Indiana
No building running yet
As of Aug 19, 2026, Epoch AI
On the Power MapUnder construction
Meta Bowling Green
Bowling Green, Ohio
No building running yet
As of Jul 30, 2026, Epoch AI
On the Power MapUnder construction
OpenAI Stargate Lordstown
Lordstown, Ohio
No building running yet
As of Jul 30, 2026, Epoch AI
On the Power Map19 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). A site's place on that map is a guide, not proof of which utility serves it.
Sources
Where every figure comes from
Each source was opened and read on November 23, 2026.
validated May 15, 2020, read Nov 23, 2026
U.S. Department of Homeland Security, HIFLD Open (public copy)
Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018
Jul 30, 2025, read Nov 23, 2026
AEP
Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)
Oct 29, 2025, read Nov 23, 2026
AEP
Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)
Nov 24, 2025, read Nov 23, 2026
PJM
Load Adjustment Requests Summary for the 2026 Load Forecast, Load Analysis Subcommittee
Jan 14, 2026, read Nov 23, 2026
PJM
2026 PJM Load Forecast Report
Feb 12, 2026, read Nov 23, 2026
AEP
Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1)
May 5, 2026, read Nov 23, 2026
AEP
First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)
Jul 30, 2026, read Nov 23, 2026
AEP
Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)
Sep 29, 2026, read Nov 23, 2026
Dominion Energy, to PJM
Dominion Energy LSE 20-Year Data Center Forecast, Load Analysis Subcommittee
Oct 28, 2026, read Nov 23, 2026
AEP
Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)
retrieved Nov 10, 2026
Epoch AI
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
Keep going
The same grid, other records
Every page of the set reads a different public record.
Power Map
Every SI data center public data can confirm, with its power.
Open the mapGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerOnsite Power Watch
The plants built to run data centers directly.
See the plantsGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsBill Watch
Home power prices in every state with a site.
Read the billQuestions
PJM, answered
The figures, the stages and the limits.
How much power are data centers asking PJM for?
PJM has no single queue of loads. Utilities send it large load adjustments for its load forecast, and PJM accepts or trims them. Its own read in November 2025 supported data center growth of up to about 30 GW from 2025 to 2030. Dominion Energy, the largest data center market in PJM, told PJM in September 2026 that about 54 GW of data center capacity is under contract with it. Each figure on this page has its own definition and date; figures with different definitions are never added together.
Is all of that going to be built?
No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.
Which data centers are inside PJM?
The Power Map lists 19 sites inside PJM's area on the federal Control Areas map. See the list below; each links to its page.
Where do the figures come from?
From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.
How hard is PJM running right now?
Grid Watch shows PJM's demand hour by hour from the EIA, against its own forecast and its record.
Join the takeover
Read the queue with us
Open a source, check a figure yourself and bring what you find to the $SIS Telegram.