Power Map · Operating, expanding

Amazon Madison Mega Site, Canton

Amazon Madison Mega Site is an SI data center in Canton, Mississippi, United States, owned by Amazon and used by Anthropic (Epoch AI rates this speculative). Epoch AI estimates its IT power at 284 MW as of June 4, 2026, with 5 buildings operating, and projects 683 MW by March 15, 2028. Its public timeline starts on October 2, 2023.

IT power
284 MWJun 4, 2026
Facility power
341 MW
Status
Operating, expanding
Buildings operating
5

Where it is

The site and its facts

Amazon Madison Mega Site on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Canton, Mississippi, United StatesOpen in OpenStreetMap
Place
Canton, Mississippi, United States
Address
Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
Coordinates
32.5974° N, 90.0913° W
Owner
Amazon
Users
Anthropic (Epoch AI rates this speculative)
Project
Project Rainier
Chips
Trainium2
Compute
About 214,348 H100 equivalentsEpoch AI estimate, Jun 4, 2026
Projected
683 MW IT power by March 15, 2028Epoch AI projection, not a fact yet

Heat Watch

Amazon Madison Mega Site: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day.

Lights On

Amazon Madison Mega Site: light at night

NASA's night imagery read 68.8 of 100 over this site in October 2026, against 16.9 in October 2018, the first month read. Against a year before: +21.0 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Amazon Madison Mega Site, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins

    No IT power yet0 operating

  2. Generators and chillers still being installed on buildings 1-5.

    No IT power yet0 operating

  3. Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10.

    284 MW5 operating

  4. Confirmation that five buildings are fully equipped with cooling and backup generators.

    284 MW5 operating

  5. Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.

    284 MW5 operating

  6. Buildings 6 and 7 operational, estimated from roofs having been completed 9 months ago (similar timeline to AWS buildings at New Carlisle in 2025).

    284 MW7 operating

  7. Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with expected completion by 2027. This final estimates adds three months to that for server installation.

    683 MW12 operating

Adopt a site

Watch Amazon Madison Mega Site

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Amazon Madison Mega Site, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Amazon Madison Mega Site?

Amazon Madison Mega Site is in Canton, Mississippi, United States, at Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County. Epoch AI publishes its coordinates as 32.5974, -90.0913.

Who owns Amazon Madison Mega Site?

Epoch AI lists Amazon as its owner and Anthropic (Epoch AI rates this speculative) as its user.

How much power does Amazon Madison Mega Site use?

Epoch AI estimates its IT power at 284 MW as of June 4, 2026, and its total facility power at 341 MW. It projects 683 MW of IT power by March 15, 2028.

Is Amazon Madison Mega Site operating?

Yes, and it is growing. Epoch AI counts 5 buildings operating as of June 4, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).