Power Map · Operating, expanding
Amazon Madison Mega Site, Canton
Amazon Madison Mega Site is an SI data center in Canton, Mississippi, United States, owned by Amazon and used by Anthropic (Epoch AI rates this speculative). Epoch AI estimates its IT power at 284 MW as of June 4, 2026, with 5 buildings operating, and projects 683 MW by March 15, 2028. Its public timeline starts on October 2, 2023.
- IT power
- 284 MWJun 4, 2026
- Facility power
- 341 MW
- Status
- Operating, expanding
- Buildings operating
- 5
Where it is
The site and its facts
Amazon Madison Mega Site on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Canton, Mississippi, United States
- Address
- Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
- Coordinates
- 32.5974° N, 90.0913° W
- Owner
- Amazon
- Users
- Anthropic (Epoch AI rates this speculative)
- Project
- Project Rainier
- Chips
- Trainium2
- Compute
- About 214,348 H100 equivalentsEpoch AI estimate, Jun 4, 2026
- Projected
- 683 MW IT power by March 15, 2028Epoch AI projection, not a fact yet
Heat Watch
Amazon Madison Mega Site: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day.
Lights On
Amazon Madison Mega Site: light at night
NASA's night imagery read 68.8 of 100 over this site in October 2026, against 16.9 in October 2018, the first month read. Against a year before: +21.0 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Amazon Madison Mega Site, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins
No IT power yet0 operating
Generators and chillers still being installed on buildings 1-5.
No IT power yet0 operating
Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10.
284 MW5 operating
Confirmation that five buildings are fully equipped with cooling and backup generators.
284 MW5 operating
Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.
284 MW5 operating
Buildings 6 and 7 operational, estimated from roofs having been completed 9 months ago (similar timeline to AWS buildings at New Carlisle in 2025).
284 MW7 operating
Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with expected completion by 2027. This final estimates adds three months to that for server installation.
683 MW12 operating
Adopt a site
Watch Amazon Madison Mega Site
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Air Construction Permit
- Backup diesel generator referenced in the permit
- New York Times article on Project Rainier
- SemiAnalysis article with imagery of Canton they have labeled as being an Amazon-Anthropic collaboration
- Epoch AI, "AI data centers", the record for Amazon Madison Mega Site (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
Questions
Amazon Madison Mega Site, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Amazon Madison Mega Site?
Amazon Madison Mega Site is in Canton, Mississippi, United States, at Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County. Epoch AI publishes its coordinates as 32.5974, -90.0913.
Who owns Amazon Madison Mega Site?
Epoch AI lists Amazon as its owner and Anthropic (Epoch AI rates this speculative) as its user.
How much power does Amazon Madison Mega Site use?
Epoch AI estimates its IT power at 284 MW as of June 4, 2026, and its total facility power at 341 MW. It projects 683 MW of IT power by March 15, 2028.
Is Amazon Madison Mega Site operating?
Yes, and it is growing. Epoch AI counts 5 buildings operating as of June 4, 2026, with more capacity on its timeline.