Power Map · Under construction
Meta Hyperion, Holly Ridge
Meta Hyperion is an SI data center in Holly Ridge, Louisiana, United States, owned by Meta and used by Meta. Epoch AI tracks it as under construction: no building is operating yet as of April 19, 2026, and projects 1,632 MW by January 1, 2028. Its public timeline starts on December 20, 2024.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Meta Hyperion on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Holly Ridge, Louisiana, United States
- Address
- Holly Ridge, LA 71269
- Coordinates
- 32.5106° N, 91.6360° W
- Owner
- Meta
- Users
- Meta
- Project
- Hyperion
- Energy
- Entergy
- Builders
- Mortenson
- Projected
- 1,632 MW IT power by January 1, 2028Epoch AI projection, not a fact yet
Seen from orbit · Compute Watch
The newest clear pass over Meta Hyperion
The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.
Open Compute WatchThe Gigawatt Ledger · Under construction
Meta Hyperion: announced against built
2 GW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of April 19, 2026.
Heat Watch
Meta Hyperion: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.6 °C against the land 5 to 10 km around it by day.
Lights On
Meta Hyperion: light at night
NASA's night imagery read 64.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +34.3 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Meta Hyperion, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins.
No IT power yet0 operating
Foundations are underway for the main buildings, and the overall layout aligns with the architectural renderings published in 2025.
No IT power yet0 operating
Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.
No IT power yet0 operating
New power stations are in service for a 1.8 GW load at Holly Ridge. However, the data center is still not operational.
No IT power yet0 operating
First phase is operational, based on a Meta blog post. We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta claims that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidence for this happening at the Holly Ridge site alone.
1,632 MW9 operating
Adopt a site
Watch Meta Hyperion
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Data center profile by Meta
- Entergy's application for generation and transmission resources
- MISO update with 1.8 GW substation plan
- S&P Global ratings research with 2.064 GW campus details
- Epoch AI, "AI data centers", the record for Meta Hyperion (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
136 km away
Amazon Ridgeland
Ridgeland, Mississippi, United States
228 MW IT power
145 km away
Amazon Madison Mega Site
Canton, Mississippi, United States
284 MW IT power
313 km away
Colossus 2
Memphis, Tennessee, United States
946 MW IT power
315 km away
Colossus 1
Memphis, Tennessee, United States
340 MW IT power
Questions
Meta Hyperion, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Meta Hyperion?
Meta Hyperion is in Holly Ridge, Louisiana, United States, at Holly Ridge, LA 71269. Epoch AI publishes its coordinates as 32.5106, -91.6360.
Who owns Meta Hyperion?
Epoch AI lists Meta as its owner and Meta as its user.
How much power does Meta Hyperion use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,632 MW of IT power by January 1, 2028.
Is Meta Hyperion operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).