1. Home
  2. Power Map
  3. Meta Hyperion

Power Map · Under construction

Meta Hyperion, Holly Ridge

Meta Hyperion is an SI data center in Holly Ridge, Louisiana, United States, owned by Meta and used by Meta. Epoch AI tracks it as under construction: no building is operating yet as of April 19, 2026, and projects 1,632 MW by January 1, 2028. Its public timeline starts on December 20, 2024.

IT power
Not statedEpoch AI
Facility power
Not stated
Status
Under construction
Buildings operating
0

Where it is

The site and its facts

Meta Hyperion on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Holly Ridge, Louisiana, United StatesOpen in OpenStreetMap
Place
Holly Ridge, Louisiana, United States
Address
Holly Ridge, LA 71269
Coordinates
32.5106° N, 91.6360° W
Owner
Meta
Users
Meta
Project
Hyperion
Energy
Entergy
Builders
Mortenson
Projected
1,632 MW IT power by January 1, 2028Epoch AI projection, not a fact yet
Loading the newest clear pass

Seen from orbit · Compute Watch

The newest clear pass over Meta Hyperion

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

Open Compute Watch

The Gigawatt Ledger · Under construction

Meta Hyperion: announced against built

2 GW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of April 19, 2026.

Heat Watch

Meta Hyperion: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.6 °C against the land 5 to 10 km around it by day.

Lights On

Meta Hyperion: light at night

NASA's night imagery read 64.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +34.3 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Meta Hyperion, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins.

    No IT power yet0 operating

  2. Foundations are underway for the main buildings, and the overall layout aligns with the architectural renderings published in 2025.

    No IT power yet0 operating

  3. Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.

    No IT power yet0 operating

  4. New power stations are in service for a 1.8 GW load at Holly Ridge. However, the data center is still not operational.

    No IT power yet0 operating

  5. First phase is operational, based on a Meta blog post. We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta claims that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidence for this happening at the Holly Ridge site alone.

    1,632 MW9 operating

Adopt a site

Watch Meta Hyperion

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Meta Hyperion, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Meta Hyperion?

Meta Hyperion is in Holly Ridge, Louisiana, United States, at Holly Ridge, LA 71269. Epoch AI publishes its coordinates as 32.5106, -91.6360.

Who owns Meta Hyperion?

Epoch AI lists Meta as its owner and Meta as its user.

How much power does Meta Hyperion use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,632 MW of IT power by January 1, 2028.

Is Meta Hyperion operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).