Power Map · Operating
Colossus 1, Memphis
Colossus 1 is an SI data center in Memphis, Tennessee, United States, owned by SpaceXAI and used by Anthropic. Epoch AI estimates its IT power at 340 MW as of June 15, 2026, with 1 building operating. Its public timeline starts on April 24, 2024.
- IT power
- 340 MWJun 15, 2026
- Facility power
- 425 MW
- Status
- Operating
- Buildings operating
- 1
Where it is
The site and its facts
Colossus 1 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Memphis, Tennessee, United States
- Address
- 3231 Riverport Rd, Memphis, TN 38109
- Coordinates
- 35.0602° N, 90.1555° W
- Owner
- SpaceXAI
- Users
- Anthropic
- Chips
- H100, H200, B200
- Compute
- About 275,796 H100 equivalentsEpoch AI estimate, Jun 15, 2026
- Energy
- MLGW
Seen from orbit · Compute Watch
The newest clear pass over Colossus 1
The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.
Open Compute WatchThe Gigawatt Ledger · Partly energized
Colossus: announced against built
2 GW was announced for this project. Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below.
Heat Watch
Colossus 1: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day, a change of -0.0 °C since before work on this build began.
Lights On
Colossus 1: light at night
NASA's night imagery read 38.6 of 100 over this site in October 2026, against 34.4 in October 2018, the first month read. Against a year before: +2.2 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Colossus 1, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Construction starts with a road added on site, retrofitting a former Electrolux building.
No IT power yet0 operating
First significant/useful training workload on 25k H100s.
35 MW1 operating
139 MW1 operating
150k H100s and 50k H200s online. This is roughly when Musk said, plus on this date they reported "running jobs with 150K+ GPUs".
278 MW1 operating
Second substation almost connected (red cables)
278 MW1 operating
30k B200s added (in GB200 configuration).
340 MW1 operating
Third substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added.
268 MW1 operating
There is still construction visible in the third substation yard and next to the new cooling towers.
268 MW1 operating
Third substation was expected to power the building in Fall.
340 MW1 operating
All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.
340 MW1 operating
Anthropic announces their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates.
340 MW1 operating
We assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May.
340 MW1 operating
No major changes to the data center since February. Solar panels have been placed next to the facility.
340 MW1 operating
Adopt a site
Watch Colossus 1
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- May 2025 Electricity Provider Disclosure
- July 2025 Permit for Gas Turbines
- Southern Environmental Law Center Gas Permit Appeal, with additional satellite images
- Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUs
- Anthropic announcement
- Epoch AI, "AI data centers", the record for Colossus 1 (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
13 km away
Colossus 2
Memphis, Tennessee, United States
946 MW IT power
274 km away
Amazon Madison Mega Site
Canton, Mississippi, United States
284 MW IT power
295 km away
Amazon Ridgeland
Ridgeland, Mississippi, United States
228 MW IT power
315 km away
Meta Hyperion
Holly Ridge, Louisiana, United States
IT power not stated
Questions
Colossus 1, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Colossus 1?
Colossus 1 is in Memphis, Tennessee, United States, at 3231 Riverport Rd, Memphis, TN 38109. Epoch AI publishes its coordinates as 35.0602, -90.1555.
Who owns Colossus 1?
Epoch AI lists SpaceXAI as its owner and Anthropic as its user.
How much power does Colossus 1 use?
Epoch AI estimates its IT power at 340 MW as of June 15, 2026, and its total facility power at 425 MW.
Is Colossus 1 operating?
Yes. Epoch AI counts 1 building operating as of June 15, 2026.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).