1. Home
  2. Power Map
  3. Core42 Lake Mariner

Power Map · Operating

Core42 Lake Mariner, Barker

Core42 Lake Mariner is an SI data center in Barker, New York, United States, owned by Core42 and used by G42 (Epoch AI rates this likely). Epoch AI estimates its IT power at 58 MW as of July 23, 2026, with 2 buildings operating. Its public timeline starts on October 1, 2024.

IT power
58 MWJul 23, 2026
Facility power
58 MW
Status
Operating
Buildings operating
2

Where it is

The site and its facts

Core42 Lake Mariner on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Barker, New York, United StatesOpen in OpenStreetMap
Place
Barker, New York, United States
Address
7725 Lake Rd, Barker, NY 14012
Coordinates
43.3549° N, 78.6060° W
Owner
Core42
Users
G42 (Epoch AI rates this likely)
Chips
B200
Compute
About 71,753 H100 equivalentsEpoch AI estimate, Jul 23, 2026

The Gigawatt Ledger · Partly energized

Lake Mariner: announced against built

440 MW was announced for this project. Public evidence puts 268 MW in operation as of October 31, 2026, against 440 MW announced: 61%. The announcement states IT load, so it is set against the IT load running.

Heat Watch

Core42 Lake Mariner: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

Lights On

Core42 Lake Mariner: light at night

NASA's night imagery read 27.9 of 100 over this site in October 2026, against 2.8 in October 2018, the first month read. Against a year before: +20.1 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Core42 Lake Mariner, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.

    No IT power yet0 operating

  2. Building 1 is operational. Based on Terawulf saying "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was said to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

    16 MW1 operating

  3. Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's statement that CB2B is expected in March 2026, and is likely still in commissioning phase.

    16 MW1 operating

  4. Building 2 is operational. On February 26, Terawulf stated that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from RAAD showed no cooling fan movement on May 8th, suggesting it was not in use. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

    58 MW2 operating

  5. Both buildings still operational according to satellite imagery.

    58 MW2 operating

Adopt a site

Watch Core42 Lake Mariner

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Questions

Core42 Lake Mariner, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Core42 Lake Mariner?

Core42 Lake Mariner is in Barker, New York, United States, at 7725 Lake Rd, Barker, NY 14012. Epoch AI publishes its coordinates as 43.3549, -78.6060.

Who owns Core42 Lake Mariner?

Epoch AI lists Core42 as its owner and G42 (Epoch AI rates this likely) as its user.

How much power does Core42 Lake Mariner use?

Epoch AI estimates its IT power at 58 MW as of July 23, 2026, and its total facility power at 58 MW.

Is Core42 Lake Mariner operating?

Yes. Epoch AI counts 2 buildings operating as of July 23, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).