Gigawatt Ledger · Partly energized
Lake Mariner, announced against built
Lake Mariner is an SI compute project in Barker, New York, by Fluidstack, TeraWulf, Core42 and Anthropic. The announced figure is 440 critical IT MW under lease (380 MW and 60 MW), from TeraWulf (Feb 26, 2026). Public evidence puts 268 MW in operation as of October 31, 2026, against 440 MW announced: 61%. The announcement states IT load, so it is set against the IT load running. Its state today: partly energized.
- Announced
- 440 MW
- Energized
- 268 MWOct 31, 2026
- State
- Partly energized
- Source links
- 4
Announced
What was said, and when
Each row is one public announcement about Lake Mariner: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.
- Company statement
Anthropic
Anthropic invests $50 billion in American AI infrastructure
Anthropic announces data centers with Fluidstack in Texas and New York. It names no site and states no power figure.
“a $50 billion investment in American computing infrastructure”
“with sites coming online throughout 2026”
- Power or capacity stated
- None stated
- Promised
- Sites online throughout 2026
- Company statement
TeraWulf
TeraWulf Reports Fourth Quarter and Full Year 2025 Results
TeraWulf lists its leases at the Lake Mariner campus (380 critical IT MW with Fluidstack, 60 with Core42) and the date each building is expected to be energized.
“39 critical IT MW HPC capacity online”
“more than 500 MW of near-term contracted campus capacity”
“Energization expected Q3 2026”
“Energization expected Q4 2026”
- Power or capacity stated
- 440 critical IT MW under lease (380 MW Fluidstack, 60 MW Core42)
- Promised
- Buildings energized from March 2026 to the fourth quarter of 2026
Built
What public evidence confirms
What is on the ground today, from the Power Map data and from any statement or filing that states live power.
Public evidence puts 268 MW in operation as of October 31, 2026, against 440 MW announced: 61%. The announcement states IT load, so it is set against the IT load running.
- Epoch AI estimate
Epoch AI · Power Map
Anthropic Lake Mariner on the Power Map
Epoch AI counts 2 buildings operating at Anthropic Lake Mariner and estimates 210 MW of IT power (245 MW for the whole facility) as of October 31, 2026.
Building 2 (AKA CB4) is operational. On February 26, Terawulf stated that CB4 was expected to be energized by Q3 2026.
- IT power running
- 210 MW
- Whole facility
- 245 MW
Epoch AI projects 378 MW of IT power by March 31, 2027. A projection, not a fact yet.
- Epoch AI estimate
Epoch AI · Power Map
Core42 Lake Mariner on the Power Map
Epoch AI counts 2 buildings operating at Core42 Lake Mariner and estimates 58 MW of IT power (58 MW for the whole facility) as of July 23, 2026.
Both buildings still operational according to satellite imagery.
- IT power running
- 58 MW
- Whole facility
- 58 MW
Heat Watch
Anthropic Lake Mariner: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.2 °C against the land 5 to 10 km around it by day.
Heat Watch
Core42 Lake Mariner: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.
Timeline
Announcements and evidence, by date
What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.
Core42 Lake Mariner: 1 building operating, 16 MW of IT power.Evidence · Epoch AI, on the Power Map
Anthropic: no power figure stated. Promised: sites online throughout 2026.Announcement · Anthropic
TeraWulf: 440 critical IT MW under lease (380 MW Fluidstack, 60 MW Core42). Promised: buildings energized from March 2026 to the fourth quarter of 2026.Announcement · TeraWulf
Anthropic Lake Mariner: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
Core42 Lake Mariner: 1 building operating, 16 MW of IT power.Evidence · Epoch AI, on the Power Map
Core42 Lake Mariner: 2 buildings operating, 58 MW of IT power.Evidence · Epoch AI, on the Power Map
Anthropic Lake Mariner: 1 building operating, 42 MW of IT power.Evidence · Epoch AI, on the Power Map
Anthropic Lake Mariner: 1 building operating, 42 MW of IT power.Evidence · Epoch AI, on the Power Map
Core42 Lake Mariner: 2 buildings operating, 58 MW of IT power.Evidence · Epoch AI, on the Power Map
Anthropic Lake Mariner: 2 buildings operating, 210 MW of IT power.Evidence · Epoch AI, on the Power Map
Corrections
See something wrong? File a correction
Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.
File a correction
Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.
A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.
Corrections on file · 0
- Loading the corrections on file.
Sources
Every link behind this page
Read on November 11, 2026. An undated page carries the date it was read.
- Anthropic invests $50 billion in American AI infrastructure, Anthropic, Nov 12, 2025
- TeraWulf Reports Fourth Quarter and Full Year 2025 Results, TeraWulf, Feb 26, 2026
- Anthropic Lake Mariner on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
- Core42 Lake Mariner on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
More projects
Keep reading the Ledger
Three more projects, the same operator first.
The whole Ledger- Delayed
Barber Lake
Colorado City, Texas
207 MW announced · nothing confirmed
Open the project - Partly energized
Colossus (Memphis and Southaven)
Memphis, Tennessee
2 GW announced · 1 to 1.7 GW
Open the project - Under construction
Meta Hyperion
Richland Parish, Louisiana
2 GW announced · nothing confirmed
Open the project