Power Map · Operating
CoreWeave Norway, Øvrebø
CoreWeave Norway is an SI data center in Øvrebø, Agder, Norway, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). Epoch AI estimates its IT power at 42 MW as of August 15, 2026, with 1 building operating. Its public timeline starts on January 23, 2024.
- IT power
- 42 MWAug 15, 2026
- Facility power
- 55 MW
- Status
- Operating
- Buildings operating
- 1
Where it is
The site and its facts
CoreWeave Norway on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Øvrebø, Agder, Norway
- Address
- Stølevegen 39, 4715 Øvrebø, Norway
- Coordinates
- 58.2588° N, 7.8984° E
- Owner
- CoreWeave
- Users
- OpenAI (Epoch AI rates this speculative)
- Chips
- B200
- Compute
- About 50,773 H100 equivalentsEpoch AI estimate, Aug 15, 2026
Heat Watch
CoreWeave Norway: heat seen from space
Over the last three summers NASA's MODIS read the ground here 0.0 °C against the land 5 to 10 km around it by day.
Lights On
CoreWeave Norway: light at night
NASA's night imagery read 2.8 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +1.3 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on CoreWeave Norway, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
This article from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here.
No IT power yet0 operating
Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, Bulk said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave.
42 MW1 operating
Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image.
42 MW1 operating
Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. Bulk is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet.
42 MW1 operating
Adopt a site
Watch CoreWeave Norway
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- CoreWeave/Bulk N01 partnership announcement
- Bulk N01 expansion announcement
- Bulk N01 campus brochure with 5-data-center plan
- Epoch AI, "AI data centers", the record for CoreWeave Norway (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
494 km away
EcoDataCenter 2
Borlänge, Dalarna County, Sweden
IT power not stated
887 km away
Google Waltham Cross
Cheshunt, Hertfordshire, United Kingdom
88 MW IT power
1,013 km away
Nebius Mantsala
Mantsala, Uusimaa, Finland
75 MW IT power
1,241 km away
Microsoft Narvik Norway
Bjerkvik, Narvik, Norway
IT power not stated
Questions
CoreWeave Norway, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is CoreWeave Norway?
CoreWeave Norway is in Øvrebø, Agder, Norway, at Stølevegen 39, 4715 Øvrebø, Norway. Epoch AI publishes its coordinates as 58.2588, 7.8984.
Who owns CoreWeave Norway?
Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.
How much power does CoreWeave Norway use?
Epoch AI estimates its IT power at 42 MW as of August 15, 2026, and its total facility power at 55 MW.
Is CoreWeave Norway operating?
Yes. Epoch AI counts 1 building operating as of August 15, 2026.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).