1. Home
  2. Power Map
  3. Google Waltham Cross

Power Map · Operating

Google Waltham Cross, Cheshunt

Google Waltham Cross is an SI data center in Cheshunt, Hertfordshire, United Kingdom, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 88 MW as of April 23, 2026, with 1 building operating. Its public timeline starts on January 1, 2024.

IT power
88 MWApr 23, 2026
Facility power
124 MW
Status
Operating
Buildings operating
1

Where it is

The site and its facts

Google Waltham Cross on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Cheshunt, Hertfordshire, United KingdomOpen in OpenStreetMap
Place
Cheshunt, Hertfordshire, United Kingdom
Address
Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH
Coordinates
51.6954° N, 0.0490° W
Owner
Google
Users
Google DeepMind (Epoch AI rates this speculative)
Chips
TPU v6e
Compute
About 123,800 H100 equivalentsEpoch AI estimate, Apr 23, 2026
Energy
Shell Energy Europe, Engie

Heat Watch

Google Waltham Cross: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

Lights On

Google Waltham Cross: light at night

NASA's night imagery read 34.1 of 100 over this site in October 2026, against 26.6 in October 2018, the first month read. Against a year before: +0.7 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Waltham Cross, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins (Sentinel-2 imagery).

    No IT power yet0 operating

  2. Building complete and operational; full buildout reached. Sentinel-2 imagery shows the building finished with components installed and cars in the car park. Confirmed by Google's official blog post announcing the Waltham Cross data centre opening (https://blog.google/company-news/inside-google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/).

    88 MW1 operating

  3. Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image; no capacity change since September 2025.

    88 MW1 operating

Adopt a site

Watch Google Waltham Cross

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Waltham Cross, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Waltham Cross?

Google Waltham Cross is in Cheshunt, Hertfordshire, United Kingdom, at Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH. Epoch AI publishes its coordinates as 51.6954, -0.0490.

Who owns Google Waltham Cross?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

How much power does Google Waltham Cross use?

Epoch AI estimates its IT power at 88 MW as of April 23, 2026, and its total facility power at 124 MW.

Is Google Waltham Cross operating?

Yes. Epoch AI counts 1 building operating as of April 23, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).