1. Home
  2. Power Map
  3. DayOne Nusajaya

Power Map · Operating

DayOne Nusajaya, Johor Bahru

DayOne Nusajaya is an SI data center in Johor Bahru, Johor, Malaysia. Epoch AI estimates its IT power at 473 MW as of October 2, 2026, with 10 buildings operating. Its public timeline starts on October 1, 2023.

IT power
473 MWOct 2, 2026
Facility power
662 MW
Status
Operating
Buildings operating
10

Where it is

The site and its facts

DayOne Nusajaya on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Johor Bahru, Johor, MalaysiaOpen in OpenStreetMap
Place
Johor Bahru, Johor, Malaysia
Address
Not public
Coordinates
1.4294° N, 103.5978° E
Owner
Not public
Chips
H100, B300
Compute
About 583,837 H100 equivalentsEpoch AI estimate, Oct 2, 2026

Heat Watch

DayOne Nusajaya: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day, a change of -0.2 °C since before work on this build began.

Lights On

DayOne Nusajaya: light at night

NASA's night imagery read 97.1 of 100 over this site in October 2026, against 58.9 in October 2018, the first month read. Against a year before: +9.6 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on DayOne Nusajaya, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Construction for Building 1-2 is underway.

    No IT power yet0 operating

  2. Buildings 1-2 are fully operational. Based on DayOne reporting that 120 MW is in operation in Johor, with 50 MW towards these two buildings. The date is based on the earliest available archived webpage, so this may have happened earlier.

    50 MW2 operating

  3. Buildings 3-6 are operational, based on them looking complete. DayOne reported that 390 MW is "in service" in Johor as of Jan 30. This is across both Nusajaya (including Phase 1, which we don't include here) and Kempas, but Nusajaya is the vast majority of capacity at this time. Building 7 and 8 look almost complete, while Building 9 and 10 shells are still under construction.

    240 MW6 operating

  4. Buildings 7-10 look mostly complete, but there is still some construction work at the edges.

    240 MW6 operating

  5. Buildings 7-10 are operational. Judging by their state in April 2026, we expect 3 months to finish construction and another 3 months to ramp to full capacity.

    473 MW10 operating

Adopt a site

Watch DayOne Nusajaya

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

DayOne Nusajaya, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is DayOne Nusajaya?

DayOne Nusajaya is in Johor Bahru, Johor, Malaysia. Epoch AI publishes its coordinates as 1.4294, 103.5978.

Who owns DayOne Nusajaya?

Epoch AI does not name an owner yet.

How much power does DayOne Nusajaya use?

Epoch AI estimates its IT power at 473 MW as of October 2, 2026, and its total facility power at 662 MW.

Is DayOne Nusajaya operating?

Yes. Epoch AI counts 10 buildings operating as of October 2, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).