Power Map · Operating

Oracle Batam, Batam

Oracle Batam is an SI data center in Batam, Riau Islands, Indonesia, owned by Oracle (Epoch AI rates this likely) and used by Tencent (Epoch AI rates this speculative). Epoch AI estimates its IT power at 72 MW as of May 6, 2026, with 3 buildings operating. Its public timeline starts on July 1, 2022.

IT power
72 MWMay 6, 2026
Facility power
94 MW
Status
Operating
Buildings operating
3

Where it is

The site and its facts

Oracle Batam on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Batam, Riau Islands, IndonesiaOpen in OpenStreetMap
Place
Batam, Riau Islands, Indonesia
Address
Not public
Coordinates
1.1883° N, 104.1050° E
Owner
Oracle (Epoch AI rates this likely)
Users
Tencent (Epoch AI rates this speculative)
Chips
B200, B300
Compute
About 84,386 H100 equivalentsEpoch AI estimate, May 6, 2026

Heat Watch

Oracle Batam: heat seen from space

Over the last three summers NASA's MODIS read the ground here -2.6 °C against the land 5 to 10 km around it by day.

Lights On

Oracle Batam: light at night

NASA's night imagery read 22.5 of 100 over this site in October 2026, against 5.7 in October 2018, the first month read. Against a year before: +0.1 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Oracle Batam, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins.

    No IT power yet0 operating

  2. Building 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.

    33 MW2 operating

  3. Building 3 shell is partly built. Building 1 and 2 look complete.

    33 MW2 operating

  4. Building 3 has cooling towers beginning to be installed.

    33 MW2 operating

  5. Building 3 looks complete including building shell, chillers and backup generators.

    33 MW2 operating

  6. Building 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.

    72 MW3 operating

  7. The three buildings look unchanged since March.

    72 MW3 operating

Adopt a site

Watch Oracle Batam

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Questions

Oracle Batam, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Oracle Batam?

Oracle Batam is in Batam, Riau Islands, Indonesia. Epoch AI publishes its coordinates as 1.1883, 104.1050.

Who owns Oracle Batam?

Epoch AI lists Oracle (Epoch AI rates this likely) as its owner and Tencent (Epoch AI rates this speculative) as its user.

How much power does Oracle Batam use?

Epoch AI estimates its IT power at 72 MW as of May 6, 2026, and its total facility power at 94 MW.

Is Oracle Batam operating?

Yes. Epoch AI counts 3 buildings operating as of May 6, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).