Power Map · Operating, expanding
Start Campus Sines Data Campus, Sines
Start Campus Sines Data Campus is an SI data center in Sines, Setúbal, Portugal, owned by Nscale and used by Microsoft. Epoch AI estimates its IT power at 33 MW as of August 16, 2026, with 1 building operating, and projects 233 MW by September 30, 2027. Its public timeline starts on January 1, 2022.
- IT power
- 33 MWAug 16, 2026
- Facility power
- 40 MW
- Status
- Operating, expanding
- Buildings operating
- 1
Where it is
The site and its facts
Start Campus Sines Data Campus on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Sines, Setúbal, Portugal
- Address
- Start Campus - Sustainable Data Center Services, Sines, Portugal
- Coordinates
- 37.9350° N, 8.8127° W
- Owner
- Nscale
- Users
- Microsoft
- Chips
- B300
- Compute
- About 31,834 H100 equivalentsEpoch AI estimate, Aug 16, 2026
- Projected
- 233 MW IT power by September 30, 2027Epoch AI projection, not a fact yet
Heat Watch
Start Campus Sines Data Campus: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.8 °C against the land 5 to 10 km around it by day.
Lights On
Start Campus Sines Data Campus: light at night
NASA's night imagery read 35.7 of 100 over this site in October 2026, against 26.4 in October 2018, the first month read. Against a year before: +10.3 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Start Campus Sines Data Campus, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins for Building 1 (SIN01)
No IT power yet0 operating
Building 1 (SIN01) is completed, but at this point it likely not being used for AI as the collaboration with Microsoft that resulted in GB300s did not occur until Q1 2026. The completion is based both on satellite imagery, which shows the building fully completed, and a March 2025 article that says it "has been in operation since October", which is October of 2024.
No IT power yet0 operating
Building 1 (SIN01) operational for AI, with the first deployment of 12,600 Nvidia GB300 NVL72s to the site being reported completed "Q1 2026" based on the corporate announcement. Land clearing also begins for Building 2 (SIN02), with faint dirt outlines for roads and building foundations visible.
33 MW1 operating
Satellite imagery shows two black outlines, suggesting two buildings going up on a second adjacent site. There is an outline of another building as well. Further to the east, there is land clearing.
33 MW1 operating
Building 2 (SIN02) projected to be operational. This is based on the timeline provided in the factsheet for the site. We expect VR200 GPUs to be used as a lot of those chips will have already been available in September 2027, and the "up to 600kW racks" in the factsheet suggest they are aiming for this.
233 MW2 operating
Adopt a site
Watch Start Campus Sines Data Campus
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Website for the site
- Factsheet for the full site
- Article detailing Microsoft collaboration and GPU amounts
- Epoch AI, "AI data centers", the record for Start Campus Sines Data Campus (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
1,676 km away
Google Waltham Cross
Cheshunt, Hertfordshire, United Kingdom
88 MW IT power
2,562 km away
CoreWeave Norway
Øvrebø, Agder, Norway
42 MW IT power
3,029 km away
EcoDataCenter 2
Borlänge, Dalarna County, Sweden
IT power not stated
3,037 km away
Nscale Keflavik
Reykjanesbær, Suðurnes, Iceland
5.1 MW IT power
Questions
Start Campus Sines Data Campus, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Start Campus Sines Data Campus?
Start Campus Sines Data Campus is in Sines, Setúbal, Portugal, at Start Campus - Sustainable Data Center Services, Sines, Portugal. Epoch AI publishes its coordinates as 37.9350, -8.8127.
Who owns Start Campus Sines Data Campus?
Epoch AI lists Nscale as its owner and Microsoft as its user.
How much power does Start Campus Sines Data Campus use?
Epoch AI estimates its IT power at 33 MW as of August 16, 2026, and its total facility power at 40 MW. It projects 233 MW of IT power by September 30, 2027.
Is Start Campus Sines Data Campus operating?
Yes, and it is growing. Epoch AI counts 1 building operating as of August 16, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).