Power Map · Under construction
Anthropic Barber Lake, Colorado City
Anthropic Barber Lake is an SI data center in Colorado City, Texas, United States, owned by Cipher Mining and used by Anthropic. Epoch AI tracks it as under construction: no building is operating yet as of July 30, 2026, and projects 207 MW by April 30, 2027. Its public timeline starts on September 18, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Anthropic Barber Lake on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Colorado City, Texas, United States
- Address
- Not public
- Coordinates
- 32.3981° N, 100.9198° W
- Owner
- Cipher Mining
- Users
- Anthropic
- Projected
- 207 MW IT power by April 30, 2027Epoch AI projection, not a fact yet
The Gigawatt Ledger · Delayed
Barber Lake: announced against built
207 MW was announced for this project. Cipher said it expected to deliver 168 MW of critical IT load by September 2026. Epoch AI's entry of July 30, 2026 reads "still under construction and not yet energized", and Epoch AI estimates the first phase for about December 2026, "about 3 months later than the disclosed target".
Heat Watch
Anthropic Barber Lake: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.5 °C against the land 5 to 10 km around it by day.
Lights On
Anthropic Barber Lake: light at night
NASA's night imagery read 24.0 of 100 over this site in October 2026, against 1.2 in October 2018, the first month read. Against a year before: +21.0 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Anthropic Barber Lake, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Site grading and civil works begin.
No IT power yet0 operating
Foundations of Building 1 are visible.
No IT power yet0 operating
Building 1 shell is complete, with rooftop units installed, and most air-cooled chillers in place in a ground yard to the north. Most of the 120 backup diesel generators are also in place. Substantial progress since Nov 2025, still under construction and not yet energized.
No IT power yet0 operating
Building 1 Phase I is operational: 168 MW critical IT power (244 MW gross), running Google TPU v7 (chip type inferred, tagged likely). We estimate ~Dec 2026, about 3 months later than the disclosed target, because the site is shell-complete but not yet energized as of the Jul 2026 image. Disclosed target: Cipher 2025-09-25 PR states the 168 MW critical IT load is "expected to be delivered by September 2026."
168 MW1 operating
Building 1 Phase II is operational: 207 MW total critical IT (300 MW gross). Phase II adds 39 MW critical IT (see Cipher 2025-11-20 PR). We estimate ~Apr 2027, about 3 months later than the ~Q1 2027 target, based on construction progress.
207 MW1 operating
Adopt a site
Watch Anthropic Barber Lake
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025)
- Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025)
- Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025)
- Anthropic to expand use of Google Cloud TPUs (Oct 2025)
- Anthropic $50B US AI infrastructure with Fluidstack (Nov 2025)
- DCD: Cipher secures Fluidstack as customer, Google as investor
- Air quality permit listing 60 x 3 MW plus 60 x 3.1MW backup generators
- Epoch AI, "AI data centers", the record for Anthropic Barber Lake (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
107 km away
OpenAI Stargate Abilene
Abilene, Texas, United States
824 MW IT power
107 km away
Crusoe Abilene Expansion
Abilene, Texas, United States
IT power not stated
130 km away
OpenAI Stargate Shackelford
Abilene, Texas, United States
IT power not stated
153 km away
Coreweave Helios
Afton, Texas, United States
132 MW IT power
Questions
Anthropic Barber Lake, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Anthropic Barber Lake?
Anthropic Barber Lake is in Colorado City, Texas, United States. Epoch AI publishes its coordinates as 32.3981, -100.9198.
Who owns Anthropic Barber Lake?
Epoch AI lists Cipher Mining as its owner and Anthropic as its user.
How much power does Anthropic Barber Lake use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 207 MW of IT power by April 30, 2027.
Is Anthropic Barber Lake operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).