Onsite Power Watch · Gas
Apollo Power Generation Facility
Apollo Power Generation Facility: gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries. It serves the data center campus of Liames, LLC, beside the plant in Wood County, Ohio. Status: permitted, as of February 3, 2026. Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.
- Size
- 350 MW
- Fuel
- Gas
- Status
- Permitted
- As of
- Feb 3, 2026
The facts
What the public record shows
On site, behind the meter or beside the campus. Each fact below names its source.
- The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).
- Epoch AI's record of Meta Bowling Green, which the Power Map uses, lists the Apollo project and the Siting Board announcement among its sources.
The filing
The permit or filing behind it
The regulator's decision or the owner's filing that the status rests on.
Permitted · Feb 3, 2026
Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.
The site
The data center it serves
Linked to the Power Map only where a source ties the two.
Sources
Where every fact comes from
Each source was opened and read on November 23, 2026.
Feb 3, 2026, read Nov 23, 2026
Ohio Power Siting Board
OPSB authorizes construction of Wood County power plant
retrieved Nov 10, 2026
Epoch AI
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
Keep going
The grid around it
The same place, other records.
The Queue: PJM
How much power data centers are asking PJM for.
See the queueOnsite Power Watch
Every plant built to run a data center directly.
Every plantGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerQuestions
Apollo Power Generation Facility, answered
The plant, its status and the sources.
What is Apollo Power Generation Facility?
Gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries, built to serve The data center campus of Liames, LLC, beside the plant in Wood County, Ohio. On site, behind the meter or beside the campus.
What is its status?
Permitted, as of February 3, 2026: Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.
Where do the facts come from?
From the sources listed on this page, each opened and read on November 23, 2026. The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).
Join the takeover