Apollo Power Generation Facility: gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries. It serves the data center campus of Liames, LLC, beside the plant in Wood County, Ohio. Status: permitted, as of February 3, 2026. Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

Size
350 MW
Fuel
Gas
Status
Permitted

The facts

What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

  • The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).
  • Epoch AI's record of Meta Bowling Green, which the Power Map uses, lists the Apollo project and the Siting Board announcement among its sources.

The filing

The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Permitted · Feb 3, 2026

Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

Open the filing

The site

The data center it serves

Linked to the Power Map only where a source ties the two.

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026.

  • Feb 3, 2026, read Nov 23, 2026

    Ohio Power Siting Board

    OPSB authorizes construction of Wood County power plant

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Apollo Power Generation Facility, answered

The plant, its status and the sources.

What is Apollo Power Generation Facility?

Gas generation with about 120 MW of battery storage, 350 MW, plus about 120 MW of batteries, built to serve The data center campus of Liames, LLC, beside the plant in Wood County, Ohio. On site, behind the meter or beside the campus.

What is its status?

Permitted, as of February 3, 2026: Ohio Power Siting Board certificate, case 25-973-EL-BGN, announced February 3, 2026.

Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The Ohio Power Siting Board authorized Will-Power OH, LLC to build a 350 MW gas plant with about 120 MW of battery storage in Middleton Township, Wood County, behind the meter with no physical connection to the grid (OPSB, February 3, 2026).

Join the takeover

Watch the plants with us

Found a newer permit or filing for this plant? Bring it to the $SIS Telegram with its link.