Socrates North and South

Socrates North and South: gas turbines and engines, two 200 MW sites, 400 MW (200 MW each). It serves a data center of Sidecat, LLC, an affiliate of Meta Platforms, in New Albany, Ohio. Status: building, as of May 5, 2026. Ohio Power Siting Board approval of Socrates South (case 25-0185-EL-BLN), announced June 9, 2025.

Size
400 MW
Fuel
Gas
Status
Building

The facts

What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

  • The Ohio Power Siting Board approved Socrates South, a 200 MW gas plant built by a Williams subsidiary, behind the meter and not connected to the grid, for an adjacent data center of Sidecat, LLC, a Meta affiliate (OPSB, June 9, 2025).
  • Williams' fact sheet lists Socrates North and South at 200 MW each, targeting service in the third quarter of 2026.
  • On May 5, 2026 Williams said the Socrates project was under construction in Ohio and nearing completion.

The filing

The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Building · May 5, 2026

Ohio Power Siting Board approval of Socrates South (case 25-0185-EL-BLN), announced June 9, 2025.

Open the filing

The site

The data center it serves

Linked to the Power Map only where a source ties the two.

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026.

  • Jun 9, 2025, read Nov 23, 2026

    Ohio Power Siting Board

    OPSB approves construction of Licking County natural gas-fired power plant

    Open the source

  • August 2025, read Nov 23, 2026

    Williams

    Socrates North and South fact sheet

    Open the source

  • May 5, 2026, read Nov 23, 2026

    Williams

    Q1 earnings recap: data centers accelerate new growth paths for Williams

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Socrates North and South, answered

The plant, its status and the sources.

What is Socrates North and South?

Gas turbines and engines, two 200 MW sites, 400 MW (200 MW each), built to serve A data center of Sidecat, LLC, an affiliate of Meta Platforms, in New Albany, Ohio. On site, behind the meter or beside the campus.

What is its status?

Building, as of May 5, 2026: Ohio Power Siting Board approval of Socrates South (case 25-0185-EL-BLN), announced June 9, 2025.

Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The Ohio Power Siting Board approved Socrates South, a 200 MW gas plant built by a Williams subsidiary, behind the meter and not connected to the grid, for an adjacent data center of Sidecat, LLC, a Meta affiliate (OPSB, June 9, 2025).