- Southaven gas turbines for Colossus 2
Onsite Power Watch · Gas
Southaven gas turbines for Colossus 2
Southaven gas turbines for Colossus 2: 41 permanent gas turbines, not stated in the sources read (41 turbines). It serves xAI's Colossus 2 data center in Memphis, Tennessee, across the state line. Status: permitted, as of March 10, 2026. Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.
- Size
- Size not stated
- Fuel
- Gas
- Status
- Permitted
- As of
- Mar 10, 2026
The facts
What the public record shows
On site, behind the meter or beside the campus. Each fact below names its source.
- The Mississippi Environmental Quality Permit Board approved the construction permit for 41 permanent gas turbines on March 10, 2026 (Mississippi Free Press, March 10, 2026).
- The plant site is in Southaven, Mississippi. The report says the turbines power Colossus 2 in neighboring Memphis.
The filing
The permit or filing behind it
The regulator's decision or the owner's filing that the status rests on.
Permitted · Mar 10, 2026
Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.
The site
The data center it serves
Linked to the Power Map only where a source ties the two.
Sources
Where every fact comes from
Each source was opened and read on November 23, 2026.
Mar 10, 2026, read Nov 23, 2026
Mississippi Free Press
Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center
retrieved Nov 10, 2026
Epoch AI
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
Keep going
The grid around it
The same place, other records.
The Queue: MISO
How much power data centers are asking MISO for.
See the queueOnsite Power Watch
Every plant built to run a data center directly.
Every plantGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerQuestions
Southaven gas turbines for Colossus 2, answered
The plant, its status and the sources.
What is Southaven gas turbines for Colossus 2?
41 permanent gas turbines, not stated in the sources read (41 turbines), built to serve xAI's Colossus 2 data center in Memphis, Tennessee, across the state line. On site, behind the meter or beside the campus.
What is its status?
Permitted, as of March 10, 2026: Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.
Where do the facts come from?
From the sources listed on this page, each opened and read on November 23, 2026. The Mississippi Environmental Quality Permit Board approved the construction permit for 41 permanent gas turbines on March 10, 2026 (Mississippi Free Press, March 10, 2026).