Southaven gas turbines for Colossus 2

Southaven gas turbines for Colossus 2: 41 permanent gas turbines, not stated in the sources read (41 turbines). It serves xAI's Colossus 2 data center in Memphis, Tennessee, across the state line. Status: permitted, as of March 10, 2026. Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.

Fuel
Gas
Status
Permitted

The facts

What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

  • The Mississippi Environmental Quality Permit Board approved the construction permit for 41 permanent gas turbines on March 10, 2026 (Mississippi Free Press, March 10, 2026).
  • The plant site is in Southaven, Mississippi. The report says the turbines power Colossus 2 in neighboring Memphis.

The filing

The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Permitted · Mar 10, 2026

Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.

Open the filing

The site

The data center it serves

Linked to the Power Map only where a source ties the two.

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026.

  • Mar 10, 2026, read Nov 23, 2026

    Mississippi Free Press

    Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Southaven gas turbines for Colossus 2, answered

The plant, its status and the sources.

What is Southaven gas turbines for Colossus 2?

41 permanent gas turbines, not stated in the sources read (41 turbines), built to serve xAI's Colossus 2 data center in Memphis, Tennessee, across the state line. On site, behind the meter or beside the campus.

What is its status?

Permitted, as of March 10, 2026: Construction permit approved by the Mississippi Environmental Quality Permit Board on March 10, 2026, issued to xAI affiliate MZX Tech.

Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The Mississippi Environmental Quality Permit Board approved the construction permit for 41 permanent gas turbines on March 10, 2026 (Mississippi Free Press, March 10, 2026).

Join the takeover

Watch the plants with us

Found a newer permit or filing for this plant? Bring it to the $SIS Telegram with its link.