Stargate Abilene onsite gas plant: 10 gas turbines built; 41 more turbines and 18 generators proposed, 360 MW. It serves the OpenAI Stargate campus built by Crusoe in Abilene, Texas. Status: running, as of July 9, 2026. Minor state permits of 2024 (permits by rule and standard permits) for 10 turbines and 62 backup diesel generators; a major air permit application for the expansion.

Size
360 MW
Fuel
Gas
Status
Running

The facts

What the public record shows

On site, behind the meter or beside the campus. Each fact below names its source.

  • The report describes a 360 MW onsite gas plant with 10 turbines built under minor permits from 2024, and an expansion of 41 turbines and 18 generators sought under a major air permit application (The Texas Tribune and Floodlight, July 9, 2026).
  • Epoch AI's record of the site notes gas turbines in place beside the buildings.

The filing

The permit or filing behind it

The regulator's decision or the owner's filing that the status rests on.

Running · Jul 9, 2026

Minor state permits of 2024 (permits by rule and standard permits) for 10 turbines and 62 backup diesel generators; a major air permit application for the expansion.

Open the filing

The site

The data center it serves

Linked to the Power Map only where a source ties the two.

Sources

Where every fact comes from

Each source was opened and read on November 23, 2026.

  • Jul 9, 2026, read Nov 23, 2026

    The Texas Tribune and Floodlight

    Planned Texas data centers could emit more greenhouse gases than many countries

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Stargate Abilene onsite gas plant, answered

The plant, its status and the sources.

What is Stargate Abilene onsite gas plant?

10 gas turbines built; 41 more turbines and 18 generators proposed, 360 MW, built to serve The OpenAI Stargate campus built by Crusoe in Abilene, Texas. On site, behind the meter or beside the campus.

What is its status?

Running, as of July 9, 2026: Minor state permits of 2024 (permits by rule and standard permits) for 10 turbines and 62 backup diesel generators; a major air permit application for the expansion.

Where do the facts come from?

From the sources listed on this page, each opened and read on November 23, 2026. The report describes a 360 MW onsite gas plant with 10 turbines built under minor permits from 2024, and an expansion of 41 turbines and 18 generators sought under a major air permit application (The Texas Tribune and Floodlight, July 9, 2026).