The queue at ERCOT

ERCOT counts every request from a load of 75 MW or more at one point of interconnection. Its count grew from 63 GW in December 2024 to about 474 GW in June 2026, most of it data centers. In July 2026 the old process closed and a one time batch study took over, with a narrower count of its own.

Figures on file
12
Newest figure
Nov 5, 2026
Power Map sites inside
14
Live on Grid Watch
Yes

Over time

Where the source repeats

Each line joins one measure from one source at the dates the source gave, and nothing else. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

Large load interconnection requests
GW0125250375500Dec 2024Nov 2025Jun 2026
  • Large load interconnection requests, GW, each dot a date the source gave

Every figure

ERCOT, figure by figure

Newest first. Each card opens its source document.

On August 3, 2026, after a directive from the Governor, ERCOT paused approvals to energize data centers and crypto facilities of 75 MW or more while it verifies and audits the loads in Batch Zero (ERCOT, Item 14, September 2026).

Every ERCOT figure on The Queue, newest first
FigureAmountStageAs ofSource
Requested by the 245 large loads in the community impact surveyabout 166 GWAsked forNovember 5, 2026ERCOT
Batch Zero, conditional studied load127.9 GWIn studySeptember 3, 2026ERCOT
Batch Zero, conditional base load66.4 GWIn studySeptember 3, 2026ERCOT
Eligible for the Batch Zero studyabout 205 GWIn studyJuly 28, 2026ERCOT
Large load interconnection requestsabout 474 GWAsked forJune 2026ERCOT
Large load interconnection requests438 GWAsked forthe board deck of May 24, 2026ERCOT
Large load interconnection requestsabout 410 GWAsked forMarch 26, 2026ERCOT
Approved to energize8,876 MWApprovedFebruary 25, 2026ERCOT
Large load interconnection requestsabout 226 GWAsked forNovember 18, 2025ERCOT
Observed energizedabout 5.3 GWRunningNovember 18, 2025ERCOT
Approved to energizeabout 7.5 GWApprovedNovember 18, 2025ERCOT
Large load interconnection requests63 GWAsked forDecember 2024ERCOT

Utilities

The utilities in this grid

A utility's own count of the load it has agreed to serve, from its own filings.

American Electric Power (AEP)

AEP reports, each quarter, the new load backed by signed customer agreements across its companies in PJM, SPP and ERCOT. The count went from 24 GW in July 2025 to 69 GW through 2030 in July 2026, and to 84 GW by 2031 in October 2026. AEP's figure covers all of its companies; it is not split by grid except where AEP says so.

New load by 2030 under customer agreements
GW020406080Jul 2025Oct 2025Feb 2026May 2026Jul 2026
  • New load by 2030 under customer agreements, GW, each dot a date the source gave

On the Power Map

SI data centers inside ERCOT

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

The Power Map

Operating

OpenAI Stargate Abilene

Abilene, Texas

824 MW of IT power

As of Nov 1, 2026, Epoch AI

On the Power Map

Operating, expanding

CoreWeave Denton TX

Denton, Texas

262 MW of IT power

As of Sep 1, 2026, Epoch AI

On the Power Map

Operating

Meta Temple

Temple, Texas

178 MW of IT power

As of Sep 30, 2026, Epoch AI

On the Power Map

Operating, expanding

Coreweave Helios

Afton, Texas

132 MW of IT power

As of Aug 30, 2026, Epoch AI

On the Power Map

Operating

Google Midlothian

Midlothian, Texas

103 MW of IT power

As of Jul 1, 2026, Epoch AI

On the Power Map

Operating, expanding

Google Red Oak

Red Oak, Texas

77 MW of IT power

As of Feb 6, 2026, Epoch AI

On the Power Map

Operating

Microsoft SAT40

San Antonio, Texas

75 MW of IT power

As of Feb 4, 2026, Epoch AI

On the Power Map

Operating

Microsoft SAT14

San Antonio, Texas

47 MW of IT power

As of Mar 31, 2026, Epoch AI

On the Power Map

Operating, expanding

Vantage TX1

San Antonio, Texas

32 MW of IT power

As of Feb 15, 2026, Epoch AI

On the Power Map

Under construction

Anthropic Barber Lake

Colorado City, Texas

No building running yet

As of Jul 30, 2026, Epoch AI

On the Power Map

Under construction

Crusoe Abilene Expansion

Abilene, Texas

No building running yet

As of Jan 15, 2026, Epoch AI

On the Power Map

Under construction

Goodnight

Claude, Texas

No building running yet

On the map inside: ERCOT, SPP

As of Apr 16, 2026, Epoch AI

On the Power Map

Under construction

OpenAI Stargate Milam

Burlington, Texas

No building running yet

On the map inside: ERCOT, MISO

As of Mar 23, 2026, Epoch AI

On the Power Map

Under construction

OpenAI Stargate Shackelford

Abilene, Texas

No building running yet

As of Sep 4, 2026, Epoch AI

On the Power Map

14 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 2 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

Where every figure comes from

Each source was opened and read on November 23, 2026.

  • validated May 15, 2020, read Nov 23, 2026

    U.S. Department of Homeland Security, HIFLD Open (public copy)

    Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

    Open the source

  • Jul 30, 2025, read Nov 23, 2026

    AEP

    Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Oct 29, 2025, read Nov 23, 2026

    AEP

    Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Dec 19, 2025, read Nov 23, 2026

    ERCOT

    ERCOT Monthly, November 2025: Large Load Interconnection Requests Update

    Open the source

  • Feb 12, 2026, read Nov 23, 2026

    AEP

    Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Feb 25, 2026, read Nov 23, 2026

    ERCOT

    Large Load Interconnection Status Update to the Technical Advisory Committee

    Open the source

  • Apr 13, 2026, read Nov 23, 2026

    ERCOT

    Item 9: Interconnection and Grid Analysis Update, Board of Directors

    Open the source

  • May 5, 2026, read Nov 23, 2026

    AEP

    First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • May 24, 2026, read Nov 23, 2026

    ERCOT

    Item 8: Interconnection and Grid Analysis Update, Board of Directors, June 1 to 2, 2026

    Open the source

  • Jul 29, 2026, read Nov 23, 2026

    ERCOT

    ERCOT update to the Texas Senate, July 29, 2026: Assessing the grid

    Open the source

  • Jul 30, 2026, read Nov 23, 2026

    AEP

    Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Aug 19, 2026, read Nov 23, 2026

    ERCOT

    ERCOT update to the Texas House Committee on State Affairs, August 19, 2026

    Open the source

  • Sep 11, 2026, read Nov 23, 2026

    ERCOT

    Item 14: Batch Zero Update, Board of Directors, September 14 to 15, 2026

    Open the source

  • Oct 28, 2026, read Nov 23, 2026

    AEP

    Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Nov 5, 2026, read Nov 23, 2026

    ERCOT

    Data Center State and Community Impact RFI: Preliminary Summary, PUC Open Meeting

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

ERCOT, answered

The figures, the stages and the limits.

How much power are data centers asking ERCOT for?

ERCOT counts every request from a load of 75 MW or more at one point of interconnection. Its count grew from 63 GW in December 2024 to about 474 GW in June 2026, most of it data centers. In July 2026 the old process closed and a one time batch study took over, with a narrower count of its own. Each figure on this page has its own definition and date; figures with different definitions are never added together.

Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

Which data centers are inside ERCOT?

The Power Map lists 14 sites inside ERCOT's area on the federal Control Areas map. See the list below; each links to its page.

Where do the figures come from?

From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.

How hard is ERCOT running right now?

Grid Watch shows ERCOT's demand hour by hour from the EIA, against its own forecast and its record.