Power Map · Under construction

Goodnight, Claude

Goodnight is an SI data center in Claude, Texas, United States, owned by Google (Epoch AI rates this speculative) and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI tracks it as under construction: no building is operating yet as of April 16, 2026, and projects 1,006 MW by October 1, 2027. Its public timeline starts on May 19, 2025.

IT power
Not statedEpoch AI
Facility power
Not stated
Status
Under construction
Buildings operating
0

Where it is

The site and its facts

Goodnight on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Claude, Texas, United StatesOpen in OpenStreetMap
Place
Claude, Texas, United States
Address
10001 Lima Rd, Claude, TX 79019
Coordinates
35.0197° N, 101.3086° W
Owner
Google (Epoch AI rates this speculative)
Users
Google DeepMind (Epoch AI rates this speculative)
Energy
Serena
Builders
Crusoe, Hoffman
Projected
1,006 MW IT power by October 1, 2027Epoch AI projection, not a fact yet

Heat Watch

Goodnight: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

Lights On

Goodnight: light at night

NASA's night imagery read 80.5 of 100 over this site in October 2026, against 0.3 in October 2018, the first month read. Against a year before: +53.9 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Goodnight, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins

    No IT power yet0 operating

  2. Building 1 and 2 under construction.

    No IT power yet0 operating

  3. Construction on Building 1 and 2 looks about halfway to completion. Foundations and utility trenches are visible for Building 3-4. Building 5-6 have an outline. The substation appears to be expanding.

    No IT power yet0 operating

  4. Progress is made on all buildings, Building 1 and 2 specically have begun to install cooling structures. The substation expansion seems to be nearing completion.

    No IT power yet0 operating

  5. Building 1 operational. This regulatory document lists the completion date for Building 1 as 2026-09-12, the current status suggests this estimate will not be met. Based on the timeline seen at the Abilene,Texas site for the same building styles and the most recent imaged status, we estimate operability to occur 6 months after the state seen in Sept 2026.

    103 MW1 operating

  6. Building 2 operational. The completion date for Building 2 Tenant Improvement is 2026-11-07, about 2 months later than Building 1. We therefore add 2 months to the Building 1 operational date.

    206 MW2 operating

  7. 6 buildings are operational. This is based on: 1. A regulatory filing for Building 6 with a completion date of 2027-07-30. Normally there is a follow-up filing for "tenant improvement" which involves building the interior, with a completion date 1-3 months after the initial filing. 2. A project deadline of EOY 2027 in the original tax abatement agreement 3. The similar 8-building project in Abilene taking an estimated 2 years and 2 months.

    1,006 MW6 operating

Adopt a site

Watch Goodnight

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Questions

Goodnight, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Goodnight?

Goodnight is in Claude, Texas, United States, at 10001 Lima Rd, Claude, TX 79019. Epoch AI publishes its coordinates as 35.0197, -101.3086.

Who owns Goodnight?

Epoch AI lists Google (Epoch AI rates this speculative) as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

How much power does Goodnight use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,006 MW of IT power by October 1, 2027.

Is Goodnight operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).