Power Map · Under construction
Crusoe Abilene Expansion, Abilene
Crusoe Abilene Expansion is an SI data center in Abilene, Texas, United States, owned by Microsoft and used by Microsoft (Epoch AI rates this likely). Epoch AI tracks it as under construction: no building is operating yet as of January 15, 2026, and projects 672 MW by November 11, 2027. Its public timeline starts on November 2, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Crusoe Abilene Expansion on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Abilene, Texas, United States
- Address
- 5502 Spinks Rd, Abilene, TX 79601
- Coordinates
- 32.4919° N, 99.7820° W
- Owner
- Microsoft
- Users
- Microsoft (Epoch AI rates this likely)
- Projected
- 672 MW IT power by November 11, 2027Epoch AI projection, not a fact yet
The Gigawatt Ledger · Under construction
Abilene campus for Microsoft: announced against built
900 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of January 15, 2026.
Heat Watch
Crusoe Abilene Expansion: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day.
Lights On
Crusoe Abilene Expansion: light at night
NASA's night imagery read 70.2 of 100 over this site in October 2026, against 11.1 in October 2018, the first month read. Against a year before: +16.4 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Crusoe Abilene Expansion, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins for Buildings 1-2.
No IT power yet0 operating
Land clearing continues.
No IT power yet0 operating
Building 1 operational. Based on the completion date to "build-out an office and data hall", stated in a regulatory filing.
336 MW1 operating
Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a regulatory filing.
672 MW2 operating
Adopt a site
Watch Crusoe Abilene Expansion
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them
- Air Permit Application for the buildings, featuring blueprints on p.391
- Aterio
- Partnership Announcement with Microsoft
- Epoch AI, "AI data centers", the record for Crusoe Abilene Expansion (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
1 km away
OpenAI Stargate Abilene
Abilene, Texas, United States
824 MW IT power
23 km away
OpenAI Stargate Shackelford
Abilene, Texas, United States
IT power not stated
107 km away
Anthropic Barber Lake
Colorado City, Texas, United States
IT power not stated
175 km away
Coreweave Helios
Afton, Texas, United States
132 MW IT power
Questions
Crusoe Abilene Expansion, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Crusoe Abilene Expansion?
Crusoe Abilene Expansion is in Abilene, Texas, United States, at 5502 Spinks Rd, Abilene, TX 79601. Epoch AI publishes its coordinates as 32.4919, -99.7820.
Who owns Crusoe Abilene Expansion?
Epoch AI lists Microsoft as its owner and Microsoft (Epoch AI rates this likely) as its user.
How much power does Crusoe Abilene Expansion use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 672 MW of IT power by November 11, 2027.
Is Crusoe Abilene Expansion operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).