The Queue · NYISO
The queue at NYISO
NYISO counts the large load projects in its interconnection queue. Six projects with 1,045 MW were in it in 2022; by May 1, 2026 there were 51 projects that would add nearly 12,670 MW.
- Figures on file
- 3
- Newest figure
- May 1, 2026
- Power Map sites inside
- 2
- Live on Grid Watch
- Yes
Over time
Where the source repeats
Each line joins one measure from one source at the dates the source gave, and nothing else. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.
- Large load projects in the interconnection queue, GW, each dot a date the source gave
Every figure
NYISO, figure by figure
Newest first. Each card opens its source document.
Asked for
about 12.7 GW
as of May 1, 2026
Large load projects in the interconnection queue
51 large load projects in the queue as of May 1, 2026, which would add nearly 12,670 MW of load.
NYISO: Power Trends 2026, Jun 7, 2026
Asked for
about 6.1 GW
as of July 2025
Large load projects in the interconnection queue
29 large load projects in the queue as of July 2025, about 6,055 MW of load.
NYISO: Energy-Intensive Projects in NYISO's Interconnection Queue, Aug 26, 2025
Asked for
1,045 MW
as of 2022
Large load projects in the interconnection queue
Six large load projects in NYISO's interconnection queue in 2022, as NYISO reports in Power Trends 2026.
NYISO: Power Trends 2026, Jun 7, 2026
| Figure | Amount | Stage | As of | Source |
|---|---|---|---|---|
| Large load projects in the interconnection queue | about 12.7 GW | Asked for | May 1, 2026 | NYISO |
| Large load projects in the interconnection queue | about 6.1 GW | Asked for | July 2025 | NYISO |
| Large load projects in the interconnection queue | 1,045 MW | Asked for | 2022 | NYISO |
On the Power Map
SI data centers inside NYISO
Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.
The Power MapOperating, expanding
Anthropic Lake Mariner
Barker, New York
210 MW of IT power
As of Oct 31, 2026, Epoch AI
On the Power MapOperating
Core42 Lake Mariner
Barker, New York
58 MW of IT power
As of Jul 23, 2026, Epoch AI
On the Power Map2 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). A site's place on that map is a guide, not proof of which utility serves it.
Sources
Where every figure comes from
Each source was opened and read on November 23, 2026.
validated May 15, 2020, read Nov 23, 2026
U.S. Department of Homeland Security, HIFLD Open (public copy)
Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018
Aug 26, 2025, read Nov 23, 2026
NYISO
Energy-Intensive Projects in NYISO's Interconnection Queue
Jun 7, 2026, read Nov 23, 2026
NYISO
Power Trends 2026
retrieved Nov 10, 2026
Epoch AI
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
Keep going
The same grid, other records
Every page of the set reads a different public record.
Power Map
Every SI data center public data can confirm, with its power.
Open the mapGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerOnsite Power Watch
The plants built to run data centers directly.
See the plantsGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsBill Watch
Home power prices in every state with a site.
Read the billQuestions
NYISO, answered
The figures, the stages and the limits.
How much power are data centers asking NYISO for?
NYISO counts the large load projects in its interconnection queue. Six projects with 1,045 MW were in it in 2022; by May 1, 2026 there were 51 projects that would add nearly 12,670 MW. Each figure on this page has its own definition and date; figures with different definitions are never added together.
Is all of that going to be built?
No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.
Which data centers are inside NYISO?
The Power Map lists 2 sites inside NYISO's area on the federal Control Areas map. See the list below; each links to its page.
Where do the figures come from?
From the grid operator's own board decks, filings and reports, each read on November 23, 2026. The links are on every figure.
How hard is NYISO running right now?
Grid Watch shows NYISO's demand hour by hour from the EIA, against its own forecast and its record.
Join the takeover
Read the queue with us
Open a source, check a figure yourself and bring what you find to the $SIS Telegram.