OpenAI Stargate Shackelford, Abilene
OpenAI Stargate Shackelford is an SI data center in Abilene, Texas, United States, owned by Oracle and used by OpenAI. Epoch AI tracks it as under construction: no building is operating yet as of September 4, 2026, and projects 1,400 MW by November 11, 2028. Its public timeline starts on August 1, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
OpenAI Stargate Shackelford on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Abilene, Texas, United States
- Address
- 175 Private Road 1604, Abilene, TX 79601, Shackelford County
- Coordinates
- 32.5438° N, 99.5483° W
- Owner
- Oracle
- Users
- OpenAI
- Project
- Stargate
- Projected
- 1,400 MW IT power by November 11, 2028Epoch AI projection, not a fact yet
The Gigawatt Ledger · Under construction
Stargate Shackelford County: announced against built
1.4 GW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of September 4, 2026.
Heat Watch
OpenAI Stargate Shackelford: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day.
Lights On
OpenAI Stargate Shackelford: light at night
NASA's night imagery read 62.4 of 100 over this site in October 2026, against 0.8 in October 2018, the first month read. Against a year before: +60.0 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on OpenAI Stargate Shackelford, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins.
No IT power yet0 operating
The layout of Buildings 1-5 is visible. Steel framing has just started on Building 1.
No IT power yet0 operating
Steel framing is underway for Buildings 1-3, and roofing is underway for Building 1.
No IT power yet0 operating
Buildings 1-5 shells complete and fully roofed. Buildings 1-3 appear to be actively installing cooling and backup generators nearby. The pads for Buildings 6-10 to the north have also been visibly cleared, with foundations for Buildings 6 and 7 underway.
No IT power yet0 operating
Building 1 is operational (estimate). TDLR lists the construction completion date for Building 1 as 2027-02-15. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
140 MW1 operating
Building 2 is operational (estimate). TDLR lists the construction completion date for Building 2 as 2027-04-19. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
280 MW2 operating
Building 3 is operational (estimate). TDLR lists the construction completion date for Building 3 as 2027-05-18. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
420 MW3 operating
Building 4 is operational (estimate). TDLR lists the construction completion date for Building 4 as 2027-08-11. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
560 MW4 operating
Building 5 is operational (estimate). TDLR lists the construction completion date for Building 5 as 2027-09-08. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
700 MW5 operating
Building 6 is operational (estimate). TDLR lists the construction completion date for Building 6 as 2027-10-04. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
840 MW6 operating
Building 7 is operational (estimate). TDLR lists the construction completion date for Building 7 as 2027-11-12. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
980 MW7 operating
Building 8 is operational (estimate). TDLR lists the construction completion date for Building 8 as 2028-04-17. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
1,120 MW8 operating
Building 9 is operational (estimate). TDLR lists the construction completion date for Building 9 as 2028-04-18. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
1,260 MW9 operating
Building 10 is operational (estimate). TDLR lists the construction completion date for Building 10 as 2028-05-11. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.
1,400 MW10 operating
Adopt a site
Watch OpenAI Stargate Shackelford
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Vantage data center page with power capacity, number of buildings, and first building timeline
- OpenAI Stargate expansion announcement mentioning Shackelford site
- Vantage LinkedIn post connecting the data center to OpenAI Stargate
- TDLR filing for first building (other buildings are also on TDLR)
- Epoch AI, "AI data centers", the record for OpenAI Stargate Shackelford (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
23 km away
Crusoe Abilene Expansion
Abilene, Texas, United States
IT power not stated
23 km away
OpenAI Stargate Abilene
Abilene, Texas, United States
824 MW IT power
130 km away
Anthropic Barber Lake
Colorado City, Texas, United States
IT power not stated
184 km away
Coreweave Helios
Afton, Texas, United States
132 MW IT power
Questions
OpenAI Stargate Shackelford, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is OpenAI Stargate Shackelford?
OpenAI Stargate Shackelford is in Abilene, Texas, United States, at 175 Private Road 1604, Abilene, TX 79601, Shackelford County. Epoch AI publishes its coordinates as 32.5438, -99.5483.
Who owns OpenAI Stargate Shackelford?
Epoch AI lists Oracle as its owner and OpenAI as its user.
How much power does OpenAI Stargate Shackelford use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,400 MW of IT power by November 11, 2028.
Is OpenAI Stargate Shackelford operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.