The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review.

Figures on file
2
Newest figure
Sep 30, 2026
Power Map sites inside
9
Grid Watch
Not yet

Over time

Where the source repeats

This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

The figures below are each a single reading. A line appears here once the same source gives the same measure three times.

Every figure

Southeast, figure by figure

Newest first. Each card opens its source document.

Every Southeast figure on The Queue, newest first
FigureAmountStageAs ofSource
Southern Company: contracts agreed, under commission reviewabout 4 GWUnder contractSeptember 30, 2026Southern Company
Southern Company: large load contracts reviewed by the state commissionsabout 16 GWUnder contractSeptember 30, 2026Southern Company

On the Power Map

SI data centers inside Southeast

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

The Power Map

9 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 2 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

Where every figure comes from

Each source was opened and read on November 23, 2026.

  • validated May 15, 2020, read Nov 23, 2026

    U.S. Department of Homeland Security, HIFLD Open (public copy)

    Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

    Open the source

  • Nov 5, 2026, read Nov 23, 2026

    Southern Company

    Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

Southeast, answered

The figures, the stages and the limits.

How much power are data centers asking Southeast for?

The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review. Each figure on this page has its own definition and date; figures with different definitions are never added together.

Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

Which data centers are inside Southeast?

The Power Map lists 9 sites inside Southeast's area on the federal Control Areas map. See the list below; each links to its page.

Where do the figures come from?

From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.