The Queue · Southeast
The queue at Southeast
The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review.
- Figures on file
- 2
- Newest figure
- Sep 30, 2026
- Power Map sites inside
- 9
- Grid Watch
- Not yet
Over time
Where the source repeats
This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.
The figures below are each a single reading. A line appears here once the same source gives the same measure three times.
Every figure
Southeast, figure by figure
Newest first. Each card opens its source document.
Under contract
about 4 GW
as of September 30, 2026
Southern CompanySouthern Company: contracts agreed, under commission review
Additional contracts agreed with customers and still subject to review by the state commission. Southern Company itself calls the two together about 20 GW of Large Load Contracts, ramping up through 2029.
Southern Company: Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q), Nov 5, 2026
Under contract
about 16 GW
as of September 30, 2026
Southern CompanySouthern Company: large load contracts reviewed by the state commissions
Contracts since 2023 with new data centers and other large load customers, each over 100 MW, reviewed by the applicable state public service commission.
Southern Company: Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q), Nov 5, 2026
| Figure | Amount | Stage | As of | Source |
|---|---|---|---|---|
| Southern Company: contracts agreed, under commission review | about 4 GW | Under contract | September 30, 2026 | Southern Company |
| Southern Company: large load contracts reviewed by the state commissions | about 16 GW | Under contract | September 30, 2026 | Southern Company |
On the Power Map
SI data centers inside Southeast
Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.
The Power MapOperating
Microsoft Fairwater Atlanta
Fayetteville, Georgia
636 MW of IT power
As of Jun 14, 2026, Epoch AI
On the Power MapOperating
Colossus 1
Memphis, Tennessee
340 MW of IT power
As of Jun 15, 2026, Epoch AI
On the Power MapOperating, expanding
Meta Montgomery
Montgomery, Alabama
153 MW of IT power
As of Jun 18, 2026, Epoch AI
On the Power MapOperating
Meta Huntsville
Huntsville, Alabama
146 MW of IT power
As of Jun 2, 2026, Epoch AI
On the Power MapOperating
Meta Aiken
Aiken, South Carolina
129 MW of IT power
On the map inside: Dominion Energy South Carolina, Santee Cooper
As of Nov 5, 2026, Epoch AI
On the Power MapOperating
Meta Gallatin
Gallatin, Tennessee
87 MW of IT power
As of Aug 24, 2026, Epoch AI
On the Power MapOperating
CoreWeave Marble NC
Marble, North Carolina
65 MW of IT power
As of May 6, 2026, Epoch AI
On the Power MapOperating
CoreWeave Dalton 1 & 2
Dalton, Georgia
28 MW of IT power
On the map inside: Southern Company, TVA
As of Feb 20, 2026, Epoch AI
On the Power MapOperating
xAI QTS Atlanta
Atlanta, Georgia
17.3 MW of IT power
As of Jul 10, 2026, Epoch AI
On the Power Map9 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 2 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.
Sources
Where every figure comes from
Each source was opened and read on November 23, 2026.
validated May 15, 2020, read Nov 23, 2026
U.S. Department of Homeland Security, HIFLD Open (public copy)
Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018
Nov 5, 2026, read Nov 23, 2026
Southern Company
Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)
retrieved Nov 10, 2026
Epoch AI
The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.
Keep going
The same grid, other records
Every page of the set reads a different public record.
Power Map
Every SI data center public data can confirm, with its power.
Open the mapGigawatt Ledger
What was announced against what is confirmed energized.
Read the LedgerOnsite Power Watch
The plants built to run data centers directly.
See the plantsGrid Watch
Live demand on the grids that host the most sites.
Watch the gridsBill Watch
Home power prices in every state with a site.
Read the billQuestions
Southeast, answered
The figures, the stages and the limits.
How much power are data centers asking Southeast for?
The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review. Each figure on this page has its own definition and date; figures with different definitions are never added together.
Is all of that going to be built?
No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.
Which data centers are inside Southeast?
The Power Map lists 9 sites inside Southeast's area on the federal Control Areas map. See the list below; each links to its page.
Where do the figures come from?
From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.
Join the takeover
Read the queue with us
Open a source, check a figure yourself and bring what you find to the $SIS Telegram.