The queue at SPP

SPP studies large loads through its High Impact Large Load (HILL) process. The only count found for this page is SPP's own for Missouri: 11 requests for 3,871 MW, of which 568 MW had reached a service agreement by August 2026. SPP wide totals are on the monthly recheck list.

Figures on file
2
Newest figure
Aug 19, 2026
Power Map sites inside
10
Live on Grid Watch
Yes

Over time

Where the source repeats

This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

The figures below are each a single reading. A line appears here once the same source gives the same measure three times.

Every figure

SPP, figure by figure

Newest first. Each card opens its source document.

SPP's own Missouri detail lists 650 MW of the requests as data center load and 1,968 MW as load whose use was not disclosed.

Every SPP figure on The Queue, newest first
FigureAmountStageAs ofSource
Added to a service agreement, Missouri568 MWApprovedAugust 19, 2026SPP
HILL requests in Missouri3,871 MWAsked forAugust 19, 2026SPP

Utilities

The utilities in this grid

A utility's own count of the load it has agreed to serve, from its own filings.

American Electric Power (AEP)

AEP reports, each quarter, the new load backed by signed customer agreements across its companies in PJM, SPP and ERCOT. The count went from 24 GW in July 2025 to 69 GW through 2030 in July 2026, and to 84 GW by 2031 in October 2026. AEP's figure covers all of its companies; it is not split by grid except where AEP says so.

New load by 2030 under customer agreements
GW020406080Jul 2025Oct 2025Feb 2026May 2026Jul 2026
  • New load by 2030 under customer agreements, GW, each dot a date the source gave

On the Power Map

SI data centers inside SPP

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

The Power Map

10 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 4 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

Where every figure comes from

Each source was opened and read on November 23, 2026.

  • validated May 15, 2020, read Nov 23, 2026

    U.S. Department of Homeland Security, HIFLD Open (public copy)

    Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

    Open the source

  • Jul 30, 2025, read Nov 23, 2026

    AEP

    Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Oct 29, 2025, read Nov 23, 2026

    AEP

    Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Feb 12, 2026, read Nov 23, 2026

    AEP

    Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • May 5, 2026, read Nov 23, 2026

    AEP

    First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Jul 30, 2026, read Nov 23, 2026

    AEP

    Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • Aug 19, 2026, read Nov 23, 2026

    SPP

    SPP Status Update to the Missouri Public Service Commission

    Open the source

  • Oct 28, 2026, read Nov 23, 2026

    AEP

    Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

    Open the source

  • retrieved Nov 10, 2026

    Epoch AI

    The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

    Open the source

Questions

SPP, answered

The figures, the stages and the limits.

How much power are data centers asking SPP for?

SPP studies large loads through its High Impact Large Load (HILL) process. The only count found for this page is SPP's own for Missouri: 11 requests for 3,871 MW, of which 568 MW had reached a service agreement by August 2026. SPP wide totals are on the monthly recheck list. Each figure on this page has its own definition and date; figures with different definitions are never added together.

Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

Which data centers are inside SPP?

The Power Map lists 10 sites inside SPP's area on the federal Control Areas map. See the list below; each links to its page.

Where do the figures come from?

From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.

How hard is SPP running right now?

Grid Watch shows SPP's demand hour by hour from the EIA, against its own forecast and its record.